MahaRERA Application

General Information

Other Than Individual

Organization

Shree S S Developers Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

101
SHREE HARIHAR RESIDENCY
LAKE ROAD
BHANDUP WEST
SHIVA INDUSTRIAL ESTATE
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400078

Organization Contact Details

02225966144

Past Experience Details

Member Information

Member Name Designation Photo
VAIBHAV ATMARAM KOKATE Authorized Signatory View Photo

Project

Vishnu Bhavan Bldg no 4 A wing Valencia CHS and B wing Shree Dutt Guru CHS
New Project
21/04/2026
No
Residential
No
222A pt, 226pt, 226/4 to 19, 243pt
Yashodhan Society
Ganesh Society
Laxmi Chayya Chawl
Composite Bldg no 1
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
Kokan nagar
Bhandup west
400078
5376.69
2
2
0
385.22

FSI Details

0
16842.39
16842.39

Bank Details

DNS Bank
DNSB0000028

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 will be completed as per the approved layout
Water Conservation, Rain water Harvesting : YES 0 will be completed as per Rain water harvesting rem
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 Will be completed as per CFO NOC
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : YES 0 0
Open Parking : NO 0 NA
Water Supply : YES 0 will be applied for the same as required
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 will be completed as per Drainage approval
Storm Water Drains : YES 0 will be completed as per SWD remarks issued by MCG
Landscaping & Tree Planting : NO 0 NA
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 Vishnu Bhavan Bldg no 4 A wing Valencia CHS and B wing Shree Dutt Guru CHS A wing Valencia CHS 21/04/2026 0 1 0 17 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 34.38 44 0
2 1BHK 33.92 32 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 Vishnu Bhavan Bldg no 4 A wing Valencia CHS and B wing Shree Dutt Guru CHS B wing Shree Dutt Guru CHS 21/04/2026 0 1 0 23 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 16.73 22 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Design Crest NA Architect
Vinayak Chopdekar and Associates NA Engineer
N M Kane and Company NA Chartered Accountant

Litigations Details

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Details of encumbrances
Copy of Layout Approval (in case of layout)
Building Plan Approval / NA Order for plotted development
Building Plan Approval / NA Order for plotted development
Building Plan Approval / NA Order for plotted development
Building Plan Approval / NA Order for plotted development
Building Plan Approval / NA Order for plotted development
Commencement Certificates / NA Order for plotted development
Declaration in FORM B
Proforma of the allotment letter and agreement for sale
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Other