MahaRERA Application

General Information

Other Than Individual

Organization

HORIZON PROJECTS PVT LTD
Company
NA
Do you have any Past Experience ?
No

Address Details

5TH FLOOR
RUNWAL AND OMKAR ESQUARE
OFF EASTERN EXPRESS HIGHWAY
SION
OPP SION CHUNABHATTI SIGNAL
MAHARASHTRA
Konkan
Mumbai City
Mumbai City
Mumbai City
400022

Organization Contact Details

02261162000

Past Experience Details

Member Information

Member Name Designation Photo
Saurabh Natu Director View Photo
Deepak Lohia Director View Photo

Project

MY CITY- PHASE II -CLUSTER 05 - PART I
New Project
30/03/2025
Yes
Residential
No
S.NOS.AS PER CERTIFICATES ATTACHED
24 M WIDE D P ROAD
30 M WIDE D P ROAD
MY CITY CLUSTER - 7
MY CITY CLUSTER - 4
MAHARASHTRA
Konkan
Thane
Kalyan
Usarghar
DIVA MANPADA ROAD
USARGHAR
421201
13756.15
6
6
0
1375.62

FSI Details

49824
13487
63311

Bank Details

ICICI BANK LTD
ICIC0000740

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 0 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 80 YET TO BE STARTED
Water Conservation, Rain water Harvesting : YES 50 YET TO BE STARTED
Energy management : YES 0 YET TO BE STARTED
Fire Protection And Fire Safety Requirements : YES 95 YET TO BE STARTED
Electrical Meter Room, Sub-Station, Receiving Station : YES 60 YET TO BE STARTED
Aggregate area of recreational Open Space : YES 0 YET TO BE STARTED
Open Parking : YES 0 YET TO BE STARTED
Water Supply : YES 95 YET TO BE STARTED
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 95 YET TO BE STARTED
Storm Water Drains : YES 100 YET TO BE STARTED
Landscaping & Tree Planting : YES 15 YET TO BE STARTED
Street Lighting : YES 0 YET TO BE STARTED
Community Buildings : YES 0 YET TO BE STARTED
Treatment And Disposal Of Sewage And Sullage Water : YES 85 YET TO BE STARTED
Solid Waste Management And Disposal : YES 35 YET TO BE STARTED

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 MY CITY- PHASE II -CLUSTER 05 - PART I TOWER 1 31/03/2024 0 1 2 26 1 35 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 52.96 49 45
2 2BHK 47.73 53 52
3 3BHK 72.19 52 23
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 35
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

83
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
11 Overall Percentage of Completion of the work done For the entire Building /Wing 89.8
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 MY CITY- PHASE II -CLUSTER 05 - PART I TOWER 2 31/03/2024 0 1 2 26 1 68 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 47.43 54 50
2 1BHK 38.00 54 50
3 2BHK 52.96 100 86
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 90
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 52
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 95
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

85
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
11 Overall Percentage of Completion of the work done For the entire Building /Wing 91.7
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 MY CITY- PHASE II -CLUSTER 05 - PART I TOWER 3 31/03/2024 0 1 2 26 1 34 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 38.00 50 50
2 2BHK 47.43 53 50
3 1BHK 34.56 54 52
4 2BHK 52.96 49 43
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 85
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 35
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

65
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 95
11 Overall Percentage of Completion of the work done For the entire Building /Wing 87
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 MY CITY- PHASE II -CLUSTER 05 - PART I TOWER 4 31/03/2024 0 1 2 26 1 35 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 52.96 49 35
2 2BHK 47.43 52 44
3 3BHK 72.19 52 44
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 80
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 35
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

65
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 50
11 Overall Percentage of Completion of the work done For the entire Building /Wing 82
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 MY CITY- PHASE II -CLUSTER 05 - PART I TOWER 5 31/03/2024 0 1 2 26 1 34 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 38 54 45
2 2BHK 47.43 53 45
3 2BHK 52.96 101 63
4 Shop 186.32 1 1
5 Shop 118.51 1 1
6 Shop 163.61 1 1
7 Shop 334.55 1 1
8 Shop 204.62 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 70
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 25
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 65
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

25
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 40
11 Overall Percentage of Completion of the work done For the entire Building /Wing 72.5
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
6 MY CITY- PHASE II -CLUSTER 05 - PART I TOWER 6 31/03/2024 0 1 2 26 1 68 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 38.00 50 45
2 2BHK 47.43 53 44
3 2BHK 52.96 49 36
4 1BHK 34.56 54 52
5 Shop 191.92 1 1
6 Shop 119.27 1 1
7 Shop 136.49 1 1
8 Shop 139.18 1 1
9 Shop 147.9 1 1
10 Shop 199.46 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 5
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 65
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

15
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 20
11 Overall Percentage of Completion of the work done For the entire Building /Wing 68

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
PALLAVI MATKARI NA Architect
PRASHANT PARTE NA Architect
Neelesh Mishra A49200025942 Real Estate Agent
ROHAN GAUTAM GAIKWAD A51800022533 Real Estate Agent
METRO PROPERTIES A51800000740 Real Estate Agent
Nobroker Technologies Solutions Private Limited A51800026821 Real Estate Agent
Being Prop Life Style LLP A09400033591 Real Estate Agent
PROPERTYPISTOL REALTY PRIVATE LIMITED A51700000043 Real Estate Agent
PROPERTYOK REALTORS LLP A60100024592 Real Estate Agent
JM Financial Products Limited A51900000277 Real Estate Agent
INVESTORS CLINIC INFRATECH PRIVATE LIMITED A51700004213 Real Estate Agent
Hitendra Solanki A51800024600 Real Estate Agent
Gargi Quadri A52000000720 Real Estate Agent
BNM BUSINESS SOLUTIONS LLP A52000032289 Real Estate Agent
Horizon Financial &Properties Advisers Private Limited A51800001892 Real Estate Agent
JAIRAM M RAHEJA A51700022203 Real Estate Agent
Kshirsagar and Associates NA Chartered Accountant

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
MY CITY- PHASE II -CLUSTER 05 - PART I Tehsildar Kalyan 11 Civil Yes Suit NA 2017 Disposed off

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
3 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
18 Building Plan Approval (IOD)
19 Building Plan Approval (IOD)
20 Building Plan Approval (IOD)
21 Building Plan Approval (IOD)
22 Building Plan Approval (IOD)
23 Building Plan Approval (IOD)
24 Building Plan Approval (IOD)
25 Building Plan Approval (IOD)
26 Building Plan Approval (IOD)
27 Building Plan Approval (IOD)
28 Building Plan Approval (IOD)
29 Building Plan Approval (IOD)
30 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
4 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
3 Declaration about Commencement Certificate
4 Declaration about Commencement Certificate
5 Declaration about Commencement Certificate
6 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
30 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
31 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
32 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
33 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
34 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
35 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
36 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
37 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
38 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
39 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
40 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
41 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
42 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
43 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
44 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
45 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
46 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
47 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
48 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
49 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
50 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
51 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
52 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
53 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
54 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
55 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
56 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
57 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
58 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
59 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
60 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
61 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
62 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
63 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
64 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
65 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
66 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
67 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
68 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
69 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
70 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
71 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
72 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
73 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
74 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
75 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
76 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
77 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
78 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
79 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
80 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
81 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
82 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
83 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
84 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
85 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
86 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
87 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
88 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
89 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
90 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
91 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
92 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
93 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
94 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
95 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
96 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
97 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
98 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
99 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
100 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
101 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
102 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
103 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
104 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
105 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
106 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
107 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
108 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
109 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
110 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
111 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
112 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
113 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
114 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
115 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
116 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
117 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
118 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
119 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
120 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
121 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
122 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
123 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
124 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
125 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
126 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
127 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
128 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
129 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Form 2A
2 Form 2A
3 Form 2A
4 Form 2A
5 Form 2A
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
4 Other
5 Other
6 Other
7 Other
8 Other
9 Other
10 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000194261 Ebenezer View Orders
2 CC006000000195091 RUNWAL MY CITY CLUSTER 5 ( HORIZON PROJECTS PVT LTD View Orders
3 CC006000000210539 Hemant Jagdeesh Dubey View Orders
4 CC006000000195860 NIKHIL ASHOK DIVEKAR View Orders
5 CC006000000303388 Vinod Kumar Mahendra Maurya View Orders