MahaRERA Application

General Information

Other Than Individual

Organization

Gagan Realtors LLP
Partnership
NA
Do you have any Past Experience ?
No

Address Details

Office no 301
Marvel Alaina
Lane no 5
Koregaon Park
Above Kargo Restaurant
MAHARASHTRA
Pune
Pune
Haveli
KOREGAON PARK
411001

Organization Contact Details

02049165111

Past Experience Details

Member Information

Member Name Designation Photo
Kirankumar Tarachand Chopada Partner View Photo
Surendra Narendra Thakkar Partner View Photo
Rahul Sureshchand Garg Authorized Signatory View Photo
Rohit Sureshchand Garg Partner View Photo

Project

Gagan Signet
On-Going Project
30/06/2020
30/06/2020
30/11/2022
No
Others
Yes
66-11-1 P
66-11-1 P
Road
66-11-2
66-11-1 P
MAHARASHTRA
Pune
Pune
Haveli
kondhwa BK
0
0
411048
9888.26
3
3
0
859.14

FSI Details

10743.65
4631.47
15375.12

Bank Details

HDFC Bank
HDFC0002054

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Gagan Signet Asif Daruwala Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
Gagan Signet Arif Daruwala Individual Area Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 265 200 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 60 After the completion of all buildings
Water Conservation, Rain water Harvesting : YES 80 After completion of Main Building
Energy management : YES 20 After completion of Main Building
Fire Protection And Fire Safety Requirements : YES 80 After completion of Main Building
Electrical Meter Room, Sub-Station, Receiving Station : YES 80 After completion of Main Building
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 40 After completion of Main Building
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 70 After completion of Main Building
Storm Water Drains : YES 95 After completion of Main Building
Landscaping & Tree Planting : YES 0 As per landscape consultant drawing
Street Lighting : YES 0 Along with the road and footpath
Community Buildings : YES 80 After completion of Main Building
Treatment And Disposal Of Sewage And Sullage Water : YES 80 After completion of Main Building
Solid Waste Management And Disposal : YES 0 Along with the main building construction

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Gagan Signet A 30/12/2021 1 1 2 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 69.68 1 1
2 3BHK 79.30 2 2
3 3BHK 83.21 1 1
4 3BHK 90.35 1 1
5 2 BHK 69.49 1 1
6 3BHKPH 82.51 5 5
7 3BHK 82.32 3 3
8 2BHK 93.10 1 1
9 3BHK 101.02 1 1
10 3BHK 102.75 1 1
11 3BHK 107.43 1 1
12 3BHK 111.73 1 1
13 1 BHK Mhada 33.78 3 0
14 1 BHK Mhada 34.45 3 0
15 1 BHK Mhada 34.97 3 0
16 1 BHK Mhada 35.31 3 0
17 1 BHK Mhada 35.43 3 0
18 3BHK 81.57 6 6
19 3BHK 81.76 6 6
20 3BHK 87.08 4 4
21 3BHK 87.15 6 6
22 3 BHK 91.54 5 5
23 3BHK 91.55 5 5
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 95
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 15
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 93
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

98
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 65
11 Overall Percentage of Completion of the work done For the entire Building /Wing 86.6
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Gagan Signet B 30/12/2021 1 1 2 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 45.53 1 0
2 2BHK 78.39 1 1
3 2BHK 79.35 2 2
4 2BHK 82.18 1 1
5 2BHK 58.94 1 1
6 2BHK 59.15 2 2
7 2 BHKPH 64.80 6 1
8 2BHK 59.39 1 1
9 2BHK 59.89 1 1
10 2BHK 65.64 1 1
11 2BHK 68.28 1 1
12 2BHK 68.51 1 1
13 2BHK 69.58 1 1
14 2BHK 69.61 1 1
15 2BHK 135.37 1 1
16 1BHK 45.54 1 1
17 2BHK 61.29 4 4
18 2 BHKPH 61.43 5 5
19 1 BHK Mhada 37.39 3 0
20 1 BHK Mhada 37.88 3 0
21 1 BHK Mhada 39.21 3 0
22 1 BHK Mhada 39.65 3 0
23 1 BHK Mhada 40.97 3 0
24 2BHK 61.70 2 2
25 2BHK 61.91 3 3
26 2BHK 62.26 4 3
27 2BHK 62.30 5 4
28 2BHK 65.00 6 5
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 15
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

95
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 80
11 Overall Percentage of Completion of the work done For the entire Building /Wing 88
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Gagan Signet C 30/12/2021 0 1 2 16 1 0 1
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4BHK 105.69 1 1
2 3 BHKPH 97.72 1 0
3 3BHK 77.48 7 2
4 3BHK 92.59 3 3
5 3BHK 94.61 1 1
6 3BHK 79.07 1 1
7 3BHK 81.48 6 6
8 4BHK 81.49 7 7
9 4BHK 83.79 3 3
10 3BHK 84.07 1 1
11 3BHK 93.85 7 5
12 3BHK 93.87 5 4
13 3BHK 94.61 1 1
14 4BHK 100.46 3 3
15 4BHK 122.95 5 5
16 4BHK 113.96 1 1
17 4 BHKPH 130.63 1 1
18 4 BHKPH 110.39 4 4
19 3 BHKPH 110.25 4 4
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 82
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 7
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 90
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

90
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 55
11 Overall Percentage of Completion of the work done For the entire Building /Wing 82.4

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Viacom Reality Pvt Ltd NA Contractor
Gurudatta Enterprises NA Contractor
Jaydev Infrastructure NA Contractor
P.K.Fabrication NA Contractor
Dhanshree Specialities NA Contractor
Adesh Enterprises NA Contractor
Jaynath Kushwah NA Contractor
Saikiran Buildcon NA Contractor
Empower Designs Engg Pvt Ltd NA Contractor
Urjal consultants pvt ltd NA Contractor
Cubix Architects NA Contractor
Ultratech NA Contractor
Taib Landscape Pvt Ltd NA Contractor
Malvadkar Architects NA Architect
Design werkz Engg Pvt.Ltd NA Engineer
Abhay Motilal Bhurat A52100001258 Real Estate Agent
Jiten Ashok Gore A52100009314 Real Estate Agent
Sanjay Haribhau Gargate A52100001552 Real Estate Agent
VIKAS SATISH GUPTA A52100002607 Real Estate Agent
Addressofchoice Realty Pvt Ltd A52100000116 Real Estate Agent
Premlata Estate Solutions Pvt. Ltd. A52100000033 Real Estate Agent
Thomas C Abraham A52100000927 Real Estate Agent
Kirankumar Tarachand Chopda A52100002190 Real Estate Agent
MINT LIFESPACES A52100007639 Real Estate Agent
Bhisham Suresh Parwani A52100007974 Real Estate Agent
Signet Space Realty Private Limited A52100007915 Real Estate Agent
OPTIMUS REALTORS A52100000310 Real Estate Agent
AKASH AMOLOKCHAND KHATER A52100006171 Real Estate Agent
AMIT ARVIND SODANI A52100001140 Real Estate Agent
Bluenest Properties LLP A52100007204 Real Estate Agent
Jiten Ashok Gore a52100009314 Real Estate Agent
Nilesh Rajendra Chopda a52100003994 Real Estate Agent
AKASH AMOLOKCHAND KHATER a52100006171 Real Estate Agent
Sunil Tukaram Jadhav A52100011968 Real Estate Agent
INVESTADVISE WEALTH MANAGEMENT PRIVATE LIMITED A52100002914 Real Estate Agent
RAVIRAJ GANGAPRASAD THANVI A52100007495 Real Estate Agent
GANPAT MOOLCHAND SHARMA a52100012623 Real Estate Agent
CHAINSUKHLAL SOBHACHAND GANDHI a52100009393 Real Estate Agent
NITESH SURYAKANT SHAH A52100017028 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
7 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
18 Building Plan Approval (IOD)
19 Building Plan Approval (IOD)
20 Building Plan Approval (IOD)
21 Building Plan Approval (IOD)
22 Building Plan Approval (IOD)
23 Building Plan Approval (IOD)
24 Building Plan Approval (IOD)
25 Building Plan Approval (IOD)
26 Building Plan Approval (IOD)
27 Building Plan Approval (IOD)
28 Building Plan Approval (IOD)
29 Building Plan Approval (IOD)
30 Building Plan Approval (IOD)
31 Building Plan Approval (IOD)
32 Building Plan Approval (IOD)
33 Building Plan Approval (IOD)
34 Building Plan Approval (IOD)
35 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement