MahaRERA Application

General Information

Other Than Individual

Organization

JP Infra Realty Private Limited
Company
NA
Do you have any Past Experience ?
No

Address Details

3rd Floor
Viraj Towers
Western Express Highway
Andheri East
Near WEH Metro Station
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400093

Organization Contact Details

02242415678
www.jpinfra.com

Past Experience Details

Member Information

Member Name Designation Photo
Jambu Kumar Jain Authorized Signatory View Photo

Project

Codename StarLife
New Project
31/12/2031
No
Others
No
111 -1-2 111-2 111-5 111-8-3 111-8-4 119-1 119-2 119-3 119-4 124-1 124-2 124-3 118-4-1 118-5 118-7 125-1 125-2
125-1pt 125-2pt 118-7pt 118-5pt
111-1-2pt
111-1-2pt 125-1pt 111-2pt 111-8pt 119-1pt 119-2pt
18MV DP Road
MAHARASHTRA
Konkan
Thane
Thane
Mira-Bhayandar (M Corp.)
Mira Bhayander
Bhayander East
401107
13170
5
5
0
4370.67

FSI Details

47355.14
134000
181355.14

Bank Details

HDFC Bank
HDFC0000321

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 439 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 work not started
Energy management : YES 0 work not started
Fire Protection And Fire Safety Requirements : YES 0 work not started
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 work not started
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 work not started
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 work not started
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : NO 0 NA
Street Lighting : YES 0 work not started
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 work not started
Solid Waste Management And Disposal : YES 0 work not started

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Codename StarLife Wing A1 - Residential 31/12/2031 3 1 0 4 0 0 6
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 29.89 42 0
2 1BHK 29.84 21 0
3 2BHK 47.94 21 0
4 1BHK 37.18 21 0
5 2BHK 54.7 21 0
6 2BHK 53.49 17 0
7 1BHK 35.44 17 0
8 3BHK 68.14 21 0
9 3BHK 60.51 21 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Codename StarLife Wing A2 - Residential 31/12/2031 3 1 0 4 0 0 5
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 29.84 84 0
2 1BHK 29.89 42 0
3 2BHK 51.82 42 0
4 2BHK 49.93 21 0
5 2BHK 49.12 21 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
3 Codename StarLife Wing B1 - Residential 31/12/2031 3 1 0 4 0 0 3
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 29.86 15 0
2 1BHK 26.12 3 0
3 2BHK 45.37 3 0
4 2BHK 46.88 3 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
4 Codename StarLife Wing B2 - Residential 31/12/2031 3 1 0 4 0 0 7
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3BHK 65.26 6 0
2 1BHK 26.13 3 0
3 2BHK 45.36 12 0
4 1BHK 29.86 9 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
5 Codename StarLife Wing C - Shopping Mall/Commercial 31/12/2031 3 1 0 4 0 0 418
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 Shop 24.64 1 0
2 Big Store 1353.83 1 0
3 Big Store 549.53 1 0
4 Shop 57.65 1 0
5 Shop 73.57 2 0
6 FEC 1262.76 1 0
7 F and B 256.09 1 0
8 Big Store 1148.28 1 0
9 Shop 38.49 2 0
10 Shop 57.79 1 0
11 Shop 60.62 1 0
12 Shop 47.86 1 0
13 Shop 12.91 1 0
14 Shop 36.75 1 0
15 Shop 25.23 1 0
16 Shop 91.62 2 0
17 Shop 32.51 3 0
18 Shop 42.22 2 0
19 Shop 57.06 2 0
20 Shop 44.09 2 0
21 Shop 22.28 1 0
22 Shop 42.73 2 0
23 Shop 51.48 1 0
24 Shop 43.05 1 0
25 Shop 56.03 1 0
26 Big Store 1264.42 1 0
27 Cafe 69.21 2 0
28 Kiosk 239.37 1 0
29 Shop 30.11 1 0
30 Shop 69.52 2 0
31 Shop 36.84 1 0
32 Shop 99.51 1 0
33 Shop 80.45 1 0
34 Shop 38.5 1 0
35 Shop 24.05 1 0
36 Shop 25.7 1 0
37 Shop 24.82 1 0
38 Big Store 945.78 1 0
39 Shop 24.21 3 0
40 Shop 64.36 1 0
41 Shop 35.78 1 0
42 Shop 41.74 1 0
43 Shop 26.99 1 0
44 Big Store 590.01 1 0
45 Shop 64.63 2 0
46 Shop 60.52 1 0
47 Shop 32.3 1 0
48 Shop 60.04 1 0
49 Shop 121.87 1 0
50 Shop 99.02 2 0
51 Shop 73.46 1 0
52 Shop 88.47 1 0
53 Shop 109.88 1 0
54 Shop 20.09 1 0
55 Big Store 850.89 1 0
56 Shop 23.46 2 0
57 Shop 26.36 1 0
58 Shop 24.29 1 0
59 F and B 216.68 1 0
60 F and B 215.9 1 0
61 F and B 386.41 1 0
62 Shop 35.77 2 0
63 Shop 44.22 2 0
64 Shop 112 2 0
65 Shop 37.14 2 0
66 Shop 53.85 1 0
67 F and B 245.93 1 0
68 Shop 45.67 2 0
69 Shop 43.1 2 0
70 Shop 129.31 1 0
71 Shop 38.66 2 0
72 Shop 26.03 1 0
73 F and B 237.13 1 0
74 Shop 38.71 1 0
75 Shop 36.7 1 0
76 Shop 46.14 1 0
77 Shop 24.06 3 0
78 Shop 75.75 2 0
79 Shop 84.7 1 0
80 Shop 50.44 1 0
81 Shop 41.17 2 0
82 Shop 44.53 1 0
83 Shop 37.81 2 0
84 Shop 41.77 2 0
85 Shop 46.41 1 0
86 Shop 37.13 1 0
87 Shop 21.98 1 0
88 F and B 210.85 1 0
89 F and B 306.57 1 0
90 Shop 34.85 1 0
91 Shop 60.17 2 0
92 Shop 74.48 1 0
93 Shop 57.3 1 0
94 Shop 34 1 0
95 Shop 98.35 1 0
96 Shop 89.89 2 0
97 Shop 72.96 2 0
98 Shop 29.74 1 0
99 Shop 23.83 1 0
100 Shop 33.97 1 0
101 Shop 22.83 2 0
102 Shop 16.86 1 0
103 Shop 74 1 0
104 Shop 59.57 2 0
105 Shop 60.35 1 0
106 Shop 59.69 1 0
107 Shop 100.53 2 0
108 Shop 39.79 4 0
109 Shop 62.76 1 0
110 Shop 43.06 2 0
111 Shop 42.45 2 0
112 Shop 80.96 2 0
113 Shop 73.04 2 0
114 Shop 74.49 1 0
115 Shop 57.67 1 0
116 Shop 79.58 1 0
117 Shop 82.75 1 0
118 Shop 26.64 1 0
119 Big Store 1136.64 1 0
120 Bigstore 2803.55 1 0
121 Food Court 1057.93 1 0
122 Multiplex 2232.06 1 0
123 Shop 36.85 2 0
124 Shop 94.69 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
URBDES NA Architect
AVP Structural Consultants NA Engineer
CAS & Co NA Chartered Accountant
NEERAJ JAISINGH THAKUR A51700006760 Real Estate Agent
Deepak Kumar Jha A51800016626 Real Estate Agent
PANKAJ PURUSHOTAM RAJANI A51700002963 Real Estate Agent
PRADEEP BABULAL AGRAWAL A51800019278 Real Estate Agent
Sachin Vasant Popale A51700013711 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 a Details of encumbrances concerned to Finance
2 a Details of encumbrances concerned to Finance
3 a Details of encumbrances concerned to Finance
1 b Details of encumbrances concerned to Legal
2 b Details of encumbrances concerned to Legal
3 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
2 Building Plan Approval / NA Order for plotted development
3 Building Plan Approval / NA Order for plotted development
4 Building Plan Approval / NA Order for plotted development
5 Building Plan Approval / NA Order for plotted development
6 Building Plan Approval / NA Order for plotted development
7 Building Plan Approval / NA Order for plotted development
8 Building Plan Approval / NA Order for plotted development
9 Building Plan Approval / NA Order for plotted development
10 Building Plan Approval / NA Order for plotted development
11 Building Plan Approval / NA Order for plotted development
12 Building Plan Approval / NA Order for plotted development
13 Building Plan Approval / NA Order for plotted development
14 Building Plan Approval / NA Order for plotted development
15 Building Plan Approval / NA Order for plotted development
16 Building Plan Approval / NA Order for plotted development
17 Building Plan Approval / NA Order for plotted development
18 Building Plan Approval / NA Order for plotted development
19 Building Plan Approval / NA Order for plotted development
20 Building Plan Approval / NA Order for plotted development
21 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)
1 Disclosure of sold/ booked inventory
1 CERSAI details
2 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
2 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
2 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
2 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement
2 Deviation Report with respect to model copy of Agreement