MahaRERA Application

General Information

Other Than Individual

Organization

LJTANNA REALTY LLP
Others
LIMITED LIABILITY PARTNERSHIP
Do you have any Past Experience ?
No

Address Details

2ND FLOOR
TANNA HOUSE
11/A NATHALAL PAREKH MARG
COLABA, MUMBAI
NEAR REGAL CINEMA
MAHARASHTRA
Konkan
Mumbai Suburban
Mumbai
Greater Mumbai (M Corp.) (Part) (802794)
400039

Organization Contact Details

02222021482

Past Experience Details

Other Organization Type Member Information

Name Member Type
LAXMIKANT JAMANADAS TANNA Individual
PRASANNA BHAVANISHANKAR VYAS Individual

Project

LJTANNA PANORAMA C WING
New Project
30/12/2021
No
Residential
No
Survey No 43C2
Survey No 5
Survey No 3 Hissa No 1
Survey No 4 Hissa No 3-1-2
Survey No 3 Hissa No 1
MAHARASHTRA
Konkan
Thane
Kalyan
Sonarpada
Off Kalyan Thane Shil Road
Shankara Nagar
421203
5500
1
1
0
1070.63

FSI Details

1349.68
0
1349.68

Bank Details

INDIAN BANK
IDIB000B027

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) NONE NA 0
Covered Parking ( In Numbers) NONE NA 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 Work in Progress
Water Conservation, Rain water Harvesting : YES 0 Work in Progress
Energy management : YES 0 Solar Water Heating System
Fire Protection And Fire Safety Requirements : YES 0 Work in Progress
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Work in Progress
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 Work in Progress
Water Supply : YES 0 Shall be Given before Occupation
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Work in Progress
Storm Water Drains : YES 0 Work in Progress
Landscaping & Tree Planting : YES 0 Work in Progress
Street Lighting : YES 0 Work in Progress
Community Buildings : YES 0 Work in Progress
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 LJTANNA PANORAMA C WING LJTANNA PANORAMA C WING 31/12/2020 0 1 0 8 0 9 0
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1BHK 30.52 1 1
2 1BHK 33.95 1 1
3 1BHK 34.4 6 6
4 1BHK 33.23 15 15
5 1BHK 29.45 3 3
6 1BHK 33.65 3 3
7 1BHK 33.66 3 3
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
A S Dastane & Associates NA Architect
MEHUL DHURV & CO NA Chartered Accountant
VERTICAL LINES BUILDERS AND DEVELOPERS NA Contractor
A M Luman NA Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
2 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement