MahaRERA Application

General Information

Individual

Individual

GIRISH
Rupshi
GADA
RUPSHI NARSHI GADA
No

Address For Official Communication

B/401
PREM ASHISH
NAVROJI LANE
GHATKOPAR WEST
NEAR JAIN TEMPLE
MAHARASHTRA
Konkan
Mumbai Suburban
Kurla
Kurla
400086

Contact Details

09819008572

Past Experience Details

Project

SWAMI DARSHAN
New Project
30/12/2022
Yes
Others
Yes
1195
CTS NO 1193
EXISTING GAOTHAN LANE
HUNBOW LANE
CTS 1194 C2
MAHARASHTRA
Konkan
Mumbai Suburban
Borivali
Hunbow Lane
Junction of M. G. Road and Hunbow Lane
400067
633.6
1
1
0
0

FSI Details

1442.47
184.83
1627.30

Bank Details

HDFC BANIK
SBIN0020336

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
SWAMI DARSHAN CHETAN BHAGWAN THAKUR Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
SWAMI DARSHAN PROMODINI BHAGWAN THAKUR Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B
Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement VIEW
SWAMI DARSHAN KAVITA BHAGWAN THAKUR Individual Revenue Share View Details
Sr No. Document Name View
1 Upload Agreement / MoU Copy
2 Declaration in Form B

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 13 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 40 RECHARGE PIT PROP. PER REMARKS BY RWH CONSULTANTS
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 40 AS PER CFO NOC
Electrical Meter Room, Sub-Station, Receiving Station : YES 40 AS PER REQUIREMENT BY RELIANCE ENERGY
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 AS PER EETC NOC
Water Supply : YES 0 ON COMPLETION OF THE BUILDING
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 40 INTERNAL CHAMBERS AND LINES PROPOSED. NO STP PROP.
Storm Water Drains : YES 40 WILL BE CONNECTED TO MUNICIPAL STORM WATER DRAIN
Landscaping & Tree Planting : YES 0 AS PER TREE NOC
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 40 VERMICULTURE BIN WILL BE PROVIDED PER MCGM REQUIRE

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 SWAMI DARSHAN SWAMI DARSHAN 31/12/2021 0 1 0 8 1 2 13
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 8.13 1 0
2 1BHK 41.38 6 0
3 2BHK 62.34 4 0
4 2BHK 59.85 5 1
5 1BHK 38 3 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 90
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 75
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 70
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

70
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 60.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
ASHISH R SOLANKI NA Architect
Krupa Balia NA Chartered Accountant

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
SWAMI DARSHAN HIGH COURT MUMBAI L NO 2478 Civil No Writ Petition NA 2017 PETITION FILED
NA
SWAMI DARSHAN HIGH COURT MUMBAI 1014 Civil No Suit NA 2018 PETITION FILED
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
3 Declaration in FORM B
4 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
3 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement