General Information

Other Than Individual

Organization

SHINING SUN CONSTRUCTIONS
Partnership
NA
Do you have any Past Experience ?
No

Address Details

16/22
BAKE HOUSE
MAHARASHTRA CHAMBER OF COMMERCE LANE
FORT
RHYTHM HOUSE
MAHARASHTRA
Konkan
Mumbai City
Ward ABCD
ABCD-400023
400023

Organization Contact Details

02240866666

Past Experience Details

Member Information

Member Name Designation Photo
ADNAN NASIR JAMAL SHAIKH Authorized Signatory View Photo
ADNAN NASIR JAMAL SHAIKH Partner View Photo
NASIR JAMAL SHAIKH Partner View Photo
ZAHEDA ABU ASIM AZMI Partner View Photo

Project

MARBLE ARCH
On-Going Project
01/03/2018
01/03/2018
No
Others
No
PLOT NO.104
20 MTR WIDE ROAD
PLOT NO 105
PLOT NO 103
20 MTR WIDE ROAD
MAHARASHTRA
Konkan
Raigarh
Panvel
Taloje Panchnad
PLOT NO 104
TALOJA
410209
2082.36
1
1
0
0

FSI Details

3119.26
0
3119.26

Bank Details

KOTAK MAHINDRA BANK
KKBK0000957

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 29 0 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 NA
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 100 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 NO SUB STATION RECEIVING STATION
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 100 NA
Water Supply : YES 100 INTERNAL ONLY NO WATER CONNECTION
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 NO STP
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 100 ONLY TREE PLANTING
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 MARBLE ARCH MARBLE ARCH 0 1 1 15 1 12 29
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 SHOP 24.36 1 1
2 SHOP 26.04 1 1
3 SHOP 25.50 1 1
4 SHOP 20.23 1 1
5 SHOP 27.83 1 1
6 SHOP 17.81 1 1
7 SHOP 16.81 5 5
8 SHOP 12.77 1 1
9 RESIDENTIAL 33.77 15 14
10 RESIDENTIAL 35.65 15 14
11 RESIDENTIAL 21.63 60 48
12 SHOP 43.16 1 0
13 SHOP 19.92 1 1
14 SHOP 19.11 3 3
15 SHOP 23.40 1 1
16 SHOP 30.03 1 1
17 SHOP 17.52 1 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 100
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 80
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 98

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
TRIARCH ARCHITECTS & INTERIOR DESIGNERS NA Architect
STRUCON CONSULTING ENGINEERS NA Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement

Complaint Details

Sr.No. Complaint No Complainant Name
1 CC006000000001389 Gaurav Makkar View Orders