Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1ELITE APPARTMENTResidentialNA976.00PLOT NO-106 SECTOR-14 KOPARKHAIRNEPLOT NO-1061242007-01-012007-02-28
2ELITE ENCLAVEResidentialNA986.00PLOT NO-78 SECTOR-14 KOPARKHAIRNEPLOT NO-781282008-01-312008-09-09
3ELITE HOMEResidentialNA1249.00PLOT NO-52 SECTOR-35E KHARGHARPLOT NO-522562013-03-312013-09-19

Member Information

Member Name Designation Photo
GAURAV AGARWAL Authorized Signatory View Photo
RAKESH KUMAR AGARWAL Managing Director View Photo
SAURABH AGARWAL Managing Director View Photo

Project

ELITE GRANDEUR
On-Going Project
31/12/2016
31/03/2018
31/03/2019
Yes
Residential
No
PLOT NO-18 SECTOR-10
PLOT NO- 17
PLOT NO-19
15 METER WIDE SGR CORRIDOR
11 METER WIDE ROAD
MAHARASHTRA
Konkan
Raigarh
Panvel
Kharghar
410210
1587.02
1
1
0
40

FSI Details

2379.44
0
2379.44

Bank Details

STATE BANK OF INDIA
SBIN0003736

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 26 0 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 100 DONE
Energy management : YES 100 D.G. SET INSTALLED
Fire Protection And Fire Safety Requirements : YES 100 DONE
Electrical Meter Room, Sub-Station, Receiving Station : YES 90 WORK IN PROGESS
Aggregate area of recreational Open Space : YES 85 WORK IN PROGRESS
Open Parking : YES 100 WORK DONE
Water Supply : YES 0 TEMPORARY FROM CIDCO
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 DONE
Storm Water Drains : YES 100 DONE
Landscaping & Tree Planting : YES 80 WORK IN PROGRESS
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 ELITE GRANDEUR ELITE GRANDEUR 0 1 1 14 1 14 26
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 TYPE 1 41.14 4 0
2 TYPE 2 41.60 20 5
3 TYPE 3 43.69 4 0
4 TYPE 4 54.11 20 4
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 90
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 75
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 96.5

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Lena K. Gosavi (Dimensions Architects Pvt ltd) NA Architect
Dr. B.L. Agrawal NA Engineer

Litigations Details

Project Name Court Name Case Number Case Type Preventive/Injunction/Interim Order is Passed? Petition Name Other Petition Details Year Present Status Documents
ELITE GRANDEUR SENIOR DIVISION PANVEL CASE 98 OF 2014 Civil No Suit NA 2014 THE SUIT HAS BEEN DISSMISSED
NA

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
3 Copy of Layout Approval (in case of layout)
4 Copy of Layout Approval (in case of layout)
5 Copy of Layout Approval (in case of layout)
6 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Certificates of Architect (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
4 Other
5 Other
6 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement