MahaRERA Application

General Information

Other Than Individual

Organization

THE PRIME PROPERTIES
Partnership
NA
Do you have any Past Experience ?
No

Address Details

CITY SR NO 7354
SHOP NO 3 & 4,
PROFIT PAZA, LIMB PHATA
PUNE MUMBAI HIGHWAY
TALEGAON DABHADE
MAHARASHTRA
Pune
Pune
Mawal
Talegaon Dabhade (M Cl)
410506

Organization Contact Details

02114224848

Past Experience Details

Member Information

Member Name Designation Photo
ARCHANA SANDEEP GHARE Partner View Photo
SANDEEP CHANDRAKANT KAKADE Authorized Signatory View Photo
PUSHKRAJ HARIBHAU SHINDE Partner View Photo
VISHVANATH KHANDUJI WAJE Partner View Photo

Project

PRIME BUSINESS CENTER
New Project
30/12/2021
No
Commercial
No
452/2/3,
SR NO 715 452
7 MT WIDE ROAD
18 MT WIDE ROAD
SR NO 452
MAHARASHTRA
Pune
Pune
Mawal
Talegaon Dabhade (M Cl)
TALEOGAN SATIATION ROAD
MAWAL
410506
998.5
1
1
0
0

FSI Details

1288.63
0
1288.63

Bank Details

THE SARASWAT CO - OP BANK
SRCB0000276

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 12 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 0 AS PER DRAWINGS OBTAINED
Water Conservation, Rain water Harvesting : YES 0 AS PER DRAWINGS OBTAINED
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : YES 0 AS PER DRAWINGS OBTAINED
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : YES 0 AS PER DRAWINGS OBTAINED
Water Supply : YES 0 AS PER DRAWINGS OBTAINED
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 AS PER DRAWINGS OBTAINED
Storm Water Drains : YES 0 AS PER DRAWINGS OBTAINED
Landscaping & Tree Planting : YES 0 AS PER DRAWINGS OBTAINED
Street Lighting : YES 0 AS PER DRAWINGS OBTAINED
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 0 AS PER DRAWINGS OBTAINED
Solid Waste Management And Disposal : YES 0 DUSTBIN

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 PRIME BUSINESS CENTER BUILDING A 31/12/2020 1 1 0 5 0 134 12
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1RK 17.18 06 0
2 1RK 19.74 02 0
3 1RK 22.97 04 0
4 1RK 24.48 02 0
5 1RK 57.29 02 0
6 STORE 12.44 4 0
7 STORE 13.25 01 0
8 STORE 17.32 03 0
9 STORE 19.88 1 0
10 SHOP 17.61 1 0
11 SHOP 23.02 3 0
12 SHOP 26.43 01 0
13 SHOP 30.72 4 0
14 OFFICE 13.25 1 0
15 OFFICE 17.32 3 0
16 OFFICE 19.88 1 0
17 OFFICE 23.11 02 0
18 OFFICE 57.29 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 70

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
SHAILESH ONKAR PATIL NA Architect

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement