MahaRERA Application

General Information

Other Than Individual

Organization

Kalpataru Property Ventures LLP
Others
LLP
Do you have any Past Experience ?
Yes

Address Details

101
Kalpataru Synergy
Vakola
Santacruz East
Opp. Grand Hyatt
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
400055

Organization Contact Details

02230645000
www.kalpataru.com

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Kalpataru YashodhanResidentialNA8100Kalpataru Yashodhan SV Rd opp Andheri Fire Station Andheri West Mumbai Maharashtra 400058F P No 71 part, TPS - Andheri-VI of Village Vile Parle2402021-04-302020-01-13

Other Organization Type Member Information

Name Member Type
Kalpataru Properties (Thane) Pvt Ltd Company
Kalpataru Limited Company

Project

Kalpataru Yashodhan
On-Going Project
30/04/2020
30/04/2022
No
Residential
No
F.P. No 71 part, TPS - Andheri-VI of Village Vile Parle
12 m wide road
Partially by S V Road- F P No 70 and F P No72
Partially by F P No 69 and F P No 70
Partially by Nalla and Partially by F P No 72
MAHARASHTRA
Konkan
Mumbai Suburban
Andheri
Andheri
S.V Road
Andheri West
400058
8100
2
2
0
1620

FSI Details

14688
5732
20420.00

Bank Details

Kotak Mahindra Bank Limited
KKBK0000958

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 457 98 99

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 Shall be Completed before possession
Water Conservation, Rain water Harvesting : YES 100 WIP
Energy management : YES 96 Shall be Completed before possession
Fire Protection And Fire Safety Requirements : YES 100 Shall be Completed before possession
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 Meter room and Sub-station only
Club House,Fitness Centre Swimming pool & other Recreation areas : YES 100 WIP
NA : NO 0 NA
Aggregate area of recreational Open Space : YES 100 Shall be Completed before possession
Open Parking : YES 0 Shall be Completed before possession
Water Supply : YES 100 Supply from local authority
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 STP-Shall be Completed before possession
Storm Water Drains : YES 100 Shall be Completed before possession
Landscaping & Tree Planting : YES 96 Shall be Completed before possession
Street Lighting : YES 100 Shall be Completed before possession
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100 Shall be Completed before possession
Solid Waste Management And Disposal : YES 99 Shall be Completed before possession

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Kalpataru Yashodhan Wing A, B and C 30/04/2021 3 1 0 14 1 7 320
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK 83.95 1 1
2 2BHK 70.52 2 2
3 3BHK 83.08 1 1
4 3BHK 83.29 1 1
5 2BHK 69.77 1 1
6 2BHK 69.78 4 4
7 2BHK 69.75 2 2
8 3 BHK 129.45 9 6
9 2BHK 69.64 3 2
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90
Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
2 Kalpataru Yashodhan Wing D and E 30/04/2021 3 1 0 14 1 2 137
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 BHK 118.08 13 7
2 3 BHK 119.01 13 7
3 3 BHK 116.99 12 8
4 3 BHK 120.11 13 8
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 87
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 45
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

97
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 70
11 Overall Percentage of Completion of the work done For the entire Building /Wing 79.9

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
Mehta Jaising Builders LLP NA Contractor
Atul Gulati NA Architect
Dr. Kelkar Designs Pvt Ltd NA Engineer
Britelite NA Contractor
Sanjay Puri Architects NA Architect
P.L.Design NA Other Professional
Dnyanesh Bhave NA Other Professional
Voltech NA Other Professional
JIGAR JAYANTILAL SHAH A51800000376 Real Estate Agent
MIHIR PRAVIN DEDHIA A51800001437 Real Estate Agent
HDFC Realty Limited A51900000107 Real Estate Agent
ADITYA BIRLA HOUSING FINANCE LIMITED A51800002675 Real Estate Agent
CBRE South Asia Private Limited A51600003050 Real Estate Agent
Cushman & Wakefield India Pvt Ltd A52000000914 Real Estate Agent
ICICI Home Finance Company Limited A51800000727 Real Estate Agent
Motilal Oswal Wealth Management Limited A51800000941 Real Estate Agent
THDC Management Services Limited A51900003622 Real Estate Agent
JONES LANG LASALLE RESIDENTIAL PRIVATE LIMITED A51900000108 Real Estate Agent
BRE HOME A51700000656 Real Estate Agent
BRE HOUSING A51700001367 Real Estate Agent
Acquest Property and Hospitality Services Pvt. Ltc. A51800000384 Real Estate Agent
Kapil Ramsharan Arora A51800000438 Real Estate Agent
Conart Estate Consultancy A51800000745 Real Estate Agent
RIDDHI SIDDHI HOUSING LLP A51800001069 Real Estate Agent
MIHIR PRAVIN DEDHIA A51800001437 Real Estate Agent
UMAKANT R MISHRA A51800001992 Real Estate Agent
Akshay Sharva Construction Pvt.Ltd A51800002036 Real Estate Agent
Manish M Bandi A51800002226 Real Estate Agent
INVEST IN REALITY LLP A51800003095 Real Estate Agent
Bhaavin Doshii A51800004981 Real Estate Agent
FIRSTBRICK PROPERTIES A51800007105 Real Estate Agent
Manisha Lifespaces Consulting Pvt. Ltd. A51800008040 Real Estate Agent
Harsha Deepak Chheda A51900000996 Real Estate Agent
Dream Home Real Estate A51900001040 Real Estate Agent
SIPPY HOUSING A51800001161 Real Estate Agent

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
2 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
2 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
2 Commencement Certificates / NA Order for plotted development
3 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)
1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Certificates of CA (Form 5)
2 Certificates of CA (Form 5)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement