MahaRERA Application

General Information

Other Than Individual

Organization

R M CONSTRUCTION
Partnership
NA
Do you have any Past Experience ?
No

Address Details

S NO 6/1
PLOT NO 57
MAUJE WADALA
MAUJE WADALA
MAUJE WADALA
MAHARASHTRA
Nashik
Nashik
Nashik
Nashik
422006

Organization Contact Details

09273456020

Past Experience Details

Member Information

Member Name Designation Photo
AHMED RIZWAN MOHD AKBAR Partner View Photo
AHMED REHAN MOHAMMED MOHD AKBAR Partner View Photo
SHEHNAZ PEERMOHAMMAD PEERJADE Partner View Photo
ZOHEB PEERMOHMED PEERZADE Partner View Photo
PEERMOHOMED HAFISHAB PEERZADE Partner View Photo
AHMED REHAN MOHD AKBAR AHMED Authorized Signatory View Photo

Project

RIZA GARDEN APARTMENT
New Project
30/06/2023
No
Residential
No
SURVEY NO 6/1 PLOT NO 57
9 METER WIDE ROAD
CANAL
ADJACENT PLOT NO 56
ADJACENT PLOT NO 58 AND 59
MAHARASHTRA
Nashik
Nashik
Nashik
Nashik
NASHIK
NASHIK
422006
412.91
1
1
0
0

FSI Details

577.74
0
577.74

Bank Details

ICICI BANK
ICIC0001868

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 54 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 ONLY RAIN WATER HARVESTING
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 ONLY ELECTRICAL METER BOX
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 BORWELCOMPLETED.WATERCONNECTIONFROMNMCONCOMPLETION
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 NO STP
Storm Water Drains : NO 0 NA
Landscaping & Tree Planting : YES 0 ONLY TREE PLANTING
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 RIZA GARDEN APARTMENT RIZA GARDEN APARTMENT 30/06/2022 0 1 0 5 1 0 54
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 BHK 36.65 4 0
2 1 BHK 38.61 4 0
3 2 BHK 56.38 2 0
4 1RK 26.22 2 0
5 1RK 29.86 2 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type
AHMED RIZWAN MOHD AKBAR NA Architect
SUNIL H PATEL NA Engineer

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
1 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 Disclosure of sold/ booked inventory
1 CERSAI details
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Proforma of Allotment letter
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other – Legal
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement