MahaRERA Application

General Information

Other Than Individual

Organization

Kumar Construction and Properties Pvt Ltd
Company
NA
Do you have any Past Experience ?
Yes

Address Details

2413
KUMAR CAPITAL
EAST STREET
CAMP
NEAR AXIS BANK
MAHARASHTRA
Pune
Pune
Pune City
Pune (CB)
411001

Organization Contact Details

02030069300

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1PEBBLE PARK BResidentialNA1804HADAPSAR5512402014-06-052014-06-05
2Kumar PrincevilleResidentialNA3989.23Moshi Pimpri ChinchwadGAT no 9731342017-03-032017-03-03

Member Information

Member Name Designation Photo
KEWALKUMAR KESARIMAL JAIN Director View Photo
MANISH VIMALKUMAR JAIN Director View Photo
RAJAS VIMALKUMAR JAIN Authorized Signatory View Photo

Project

Priyadarshan - J
New Project
31/01/2024
No
Residential
No
119/2
D P Road
Part of Adj CTS No 1326 S No 119
D P Road
Part of Adj CTS No 1326 S No 119
MAHARASHTRA
Pune
Pune
Haveli
Pashan
Balaji Mandir Lane
Jai Bhavani Nagar
411021
1273.39
1
1
0
127.33

FSI Details

2501.35
0
2501.35

Bank Details

Induslnd Bank Ltd
INDB0000006

Project Details

Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 24 24 100

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : YES 100 Trimix Concrete Road
Internal Roads & Footpaths : YES 0 Trimix Concrete Road
Internal Roads & Footpaths : YES 0 Trimix Concrete Road
Water Conservation, Rain water Harvesting : YES 0 Low Flow Fixtures
Water Conservation, Rain water Harvesting : YES 100 Low Flow Fixtures
Energy management : YES 0 LED in Common Areas
Energy management : YES 100 LED in Common Areas
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Meter Room to be provided
Electrical Meter Room, Sub-Station, Receiving Station : YES 100 Meter Room to be provided
Aggregate area of recreational Open Space : YES 100 Provided as per Layout
Open Parking : YES 0 Paver Blocks
Water Supply : YES 0 Municipal Water Supply
Water Supply : YES 100 Municipal Water Supply
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Direct Connection to Municipal Drainage Line
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100 Direct Connection to Municipal Drainage Line
Storm Water Drains : YES 0 RCC Pipes with Inspection Chambers
Storm Water Drains : YES 100 RCC Pipes with Inspection Chambers
Landscaping & Tree Planting : YES 0 Plantation as per PMC Guidelines
Landscaping & Tree Planting : YES 100 Plantation as per PMC Guidelines
Street Lighting : YES 0 On electric supply
Community Buildings : YES 100 Club House Provided
Treatment And Disposal Of Sewage And Sullage Water : YES 0 Direct Connection to Municipal Drainage Line
Treatment And Disposal Of Sewage And Sullage Water : YES 100 Direct Connection to Municipal Drainage Line
Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Name (Also mention identification of building/wing/other as per approved plan) Proposed Date of Completion Number of Basement's Number of Plinth Number of Podium's Number of Sanctioned Floors Number of Stilts Total no. of open Parking as per Sanctioned Plan (4-wheeler+2-Wheeler) Number of Closed Parking
1 Priyadarshan - J J 31/01/2024 1 1 0 7 1 4 24
Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2BHK 57.50 8 8
2 2BHK 61.50 6 6
3 2BHK 60.00 8 8
4 2BHK 59.00 6 6
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 X number of Podiums 0
4 Stilt Floor 100
5 X number of Slabs of Super Structure 100
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100
11 Overall Percentage of Completion of the work done For the entire Building /Wing 90

Litigations Details

Uploaded Documents

Document Name Uploaded Document
1 Copy of the legal title report
2 Copy of the legal title report
1 Details of encumbrances
1 b Details of encumbrances concerned to Legal
1 Copy of Layout Approval (in case of layout)
1 Building Plan Approval / NA Order for plotted development
1 Commencement Certificates / NA Order for plotted development
1 Declaration about Commencement Certificate
2 Declaration about Commencement Certificate
1 Declaration in FORM B
2 Declaration in FORM B
1 Architect’s Certificate of Percentage of Completion of Work (Form 1)
2 Architect’s Certificate of Percentage of Completion of Work (Form 1)
3 Architect’s Certificate of Percentage of Completion of Work (Form 1)
4 Architect’s Certificate of Percentage of Completion of Work (Form 1)
5 Architect’s Certificate of Percentage of Completion of Work (Form 1)
6 Architect’s Certificate of Percentage of Completion of Work (Form 1)
7 Architect’s Certificate of Percentage of Completion of Work (Form 1)
8 Architect’s Certificate of Percentage of Completion of Work (Form 1)
9 Architect’s Certificate of Percentage of Completion of Work (Form 1)
10 Architect’s Certificate of Percentage of Completion of Work (Form 1)
11 Architect’s Certificate of Percentage of Completion of Work (Form 1)
1 Engineer’s Certificate on Cost Incurred on Project (Form 2)
2 Engineer’s Certificate on Cost Incurred on Project (Form 2)
3 Engineer’s Certificate on Cost Incurred on Project (Form 2)
4 Engineer’s Certificate on Cost Incurred on Project (Form 2)
5 Engineer’s Certificate on Cost Incurred on Project (Form 2)
6 Engineer’s Certificate on Cost Incurred on Project (Form 2)
7 Engineer’s Certificate on Cost Incurred on Project (Form 2)
8 Engineer’s Certificate on Cost Incurred on Project (Form 2)
9 Engineer’s Certificate on Cost Incurred on Project (Form 2)
10 Engineer’s Certificate on Cost Incurred on Project (Form 2)
11 Engineer’s Certificate on Cost Incurred on Project (Form 2)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)
1 CERSAI details
1 Disclosure of sold/ booked inventory
2 Disclosure of sold/ booked inventory
3 Disclosure of sold/ booked inventory
4 Disclosure of sold/ booked inventory
5 Disclosure of sold/ booked inventory
6 Disclosure of sold/ booked inventory
7 Disclosure of sold/ booked inventory
8 Disclosure of sold/ booked inventory
9 Disclosure of sold/ booked inventory
10 Disclosure of sold/ booked inventory
1 Disclosure of Interest in Other Real Estate Organizations
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)
1 Proforma of Agreement for sale
1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)
1 Proforma of Allotment letter
2 Proforma of Allotment letter
3 Proforma of Allotment letter
1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development
1 Architect’s Certificate on Completion of Project (Form 4)
1 Status of Formation of Legal Entity (Society/Co Op etc.)
1 Status of Conveyance
1 Other
2 Other
3 Other
1 Other – Finance
1 Other – Technical
1 Foreclosure of the Project
1 Deviation Report with respect to Allotment letter
1 Deviation Report with respect to model copy of Agreement