Project Details

Project Name:
RUNWAL EIRENE - PART I
Promoter Name:
Runwal Developers Private Limited
Certificate Download:

Promoter Organization Name:

Sr. No. Name of Self-Regulatory Organization (SRO) Membership Number
1 CREDAI - MCHI (CREDAI - Maharashtra Chamber of Housing Industry) LM-C 121/AM 41
2 NAREDCO (National Real Estate Development Council) F/065
District:
Thane
Registration Date:
09/08/2017
Proposed Date of Completion:
30/06/2025

Extension under Section 6:

Sr. No. From Date: To Date:
1st Extension NA NA

Extension under Section 7 (3):

Sr. No. From Date: To Date:
1st Extension NA NA

Building Details

Number of Apartment:
1572
Number of Booked Apartment:
1488
Percentage of Booked Apartment:
94.66

Form 5

Sr. No. Form 5 Document Upload Date View
1 Certificates of CA (Form 5) 29/10/2018
2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19) 04/12/2019
3 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) 10/03/2021
4 Certificates of CA (Form 5) 15/04/2022
5 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21) 04/06/2022
6 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) 05/12/2022
7 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) 16/11/2023
8 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) 13/01/2025

Percentage of Work:

Sr. No. Building Name Percentage of Work (%)
1 6A 100
2 6B 100
3 6C 99.5
4 6D 95.8
5 7 100
6 8 100
7 9 100
8 10 100
9 11 100
10 12 100
11 13 100

Complaint Details:

Sr. No. Complaint Number Date Appeal Filed
1 CC006000000000579 12/09/2017 No
2 CC006000000000783 12/10/2017 No
3 CC006000000001262 13/10/2017 No
4 CC006000000001797 14/11/2017 No
5 CC006000000012487 18/12/2017 No
6 CC006000000012763 08/01/2018 No
7 CC006000000054955 15/06/2018 No
8 CC006000000078952 25/04/2019 Yes
9 CC006000000078979 08/05/2019 Yes
10 CC006000000079127 05/05/2019 Yes
11 CC006000000079137 09/05/2019 No
12 CC006000000079353 20/05/2019 No
13 CC006000000089708 12/06/2019 No
14 CC006000000100440 27/08/2019 No
15 CC006000000171826 08/01/2020 No
16 CC006000000193070 20/03/2020 No
17 CC006000000193189 03/05/2020 No
18 CC006000000193311 19/06/2020 No
19 CC006000000193857 28/08/2020 No
20 CC006000000193978 10/09/2020 No
21 CC006000000194816 05/11/2020 No
22 CC006000000195178 17/12/2020 No
23 CC006000000195358 25/03/2021 Yes
24 CC006000000195522 05/01/2021 No
25 CC006000000195593 15/01/2021 No
26 CC006000000196360 17/03/2021 Yes
27 CC006000000196384 24/03/2021 No
28 CC006000000197438 29/06/2021 No
29 CC006000000198067 26/08/2021 No
30 CC006000000198068 26/08/2021 No
31 CC006000000198069 26/08/2021 No
32 CC006000000209391 16/12/2021 No
33 CC006000000220677 03/04/2022 No
34 CC006000000251522 18/06/2022 Yes
35 CC006000000251524 18/06/2022 No
36 CC006000000364548 06/03/2023 No
37 CC006000000395460 02/05/2023 No
38 CC006000000429077 14/02/2024 No
39 CC006000000429081 14/02/2024 No
40 CC006000000480010 14/04/2024 No
41 CC006000000480355 04/05/2024 No
42 CC006000000500410 08/05/2024 No
43 CC006000000591490 13/08/2024 No
Sr. No. Complaint Number Bench Name Roznama Roznama File Date
1 CC006000000000579 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA Complainant has sought time to decide NA 07/10/2017
2 CC006000000000783 NA NA NA
3 CC006000000001262 NA NA NA
4 CC006000000001797 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA Parties have agreed to register the AFS NA 28/12/2017
5 CC006000000012487 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA Parties have sought time to amicably settle the matter. NA 28/12/2017
6 CC006000000012763 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA Cancellation to be according to the T&Cs of the allotment letter. NA 30/01/2018
7 CC006000000054955 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA settled and withdrawn NA 27/11/2019
8 CC006000000078952 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both parties are present. Both parties have argued the matter at length. The complainants are seeking interest for delayed possession from December, 2018 till April 2021. The complainants also aver that amenities as promised have not been completed and the society is not formed. Complainants also aver that the change of plans is without consent as the earlier plan was only for 29 floors. The respondent has argued justifying the reasons for change of plans, non completion of the ameniti 30/08/2022
9 CC006000000078979 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both parties are present. Both parties have argued the matter at length. The complainants are seeking interest for delayed possession from December, 2018 till April 2021. The complainants also aver that amenities as promised have not been completed and the society is not formed. Complainants also aver that the change of plans is without consent as the earlier plan was only for 29 floors. The respondent has argued justifying the reasons for change of plans, non completion of the ameniti 30/08/2022
10 CC006000000079127 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both parties are present. Both parties have argued the matter at length. The complainants are seeking interest for delayed possession from December, 2018 till April 2021. The complainants also aver that amenities as promised have not been completed and the society is not formed. Complainants also aver that the change of plans is without consent as the earlier plan was only for 29 floors. The respondent has argued justifying the reasons for change of plans, non completion of the ameniti 30/08/2022
11 CC006000000079137 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA C not present NA 08/07/2019
12 CC006000000079353 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA Parties have sought time to amicably settle the matter NA 04/06/2019
13 CC006000000089708 NA NA NA
14 CC006000000100440 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA parties sought time to settle the matter amicably NA 27/11/2019
15 CC006000000171826 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the submissions of the parties. The hearing is concluded. Order is reserved. 03/12/2021
16 CC006000000193070 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Heard the arguments. The respondent to file its reply within a period of two weeks. The complainant may file rejoinder if any, in the subsequent week. The case stands adjourned till the next date of hearing which will be held on 21/1/2021. 10/11/2020
17 CC006000000193189 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The complainant is absent. The respondent is present. The MahaRERA has noticed that on last two occasions also, the complainant despite notice has remained absent. It shows that the complainant is not willing to contest these complaints. Consequently, all three complaints stand dismissed for want of prosecution. 20/06/2022
18 CC006000000193311 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The hearing was conducted through video conferencing. Both the parties have been issued notices for the hearing. Accordingly, both the parties appeared in person / through their respective advocates and made their submissions. Heard the arguments. The respondent to upload its reply on record of MahaRERA as per SOP dated 12-06-2020 within a period of 2 weeks. The final order would be passed in this case after two weeks based on the submissions by the parties. The case stands closed. NA 03/10/2020
19 CC006000000193857 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The hearing was conducted through video conferencing. Both the parties have been issued notices for the hearing. Accordingly, the respondent appeared through its advocate. However, none appeared for the complainant. During the hearing, it has brought to the notice of MahaRERA that both the parties have settled the matter amicably and accordingly, the complainant has sent withdrawal application to MahaRERA through email on 6-10-2020. The same is taken on record and accepted. Consequently, 03/10/2020
20 CC006000000193978 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The complainant is absent. The respondent is present. The MahaRERA has noticed that on last two occasions also, the complainant despite notice has remained absent. It shows that the complainant is not willing to contest these complaints. Consequently, all three complaints stand dismissed for want of prosecution. 20/06/2022
21 CC006000000194816 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present and are heard. The respondent to file reply within the period of two days, after which the final order would be passed. The hearing is concluded. Order is reserved. NA 22/12/2021
22 CC006000000195178 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the submissions. Order is reserved. 23/11/2021
23 CC006000000195358 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the submissions. The respondent may file its reply within the period of one week, after which the final order would be passed. The hearing is concluded. Order is reserved. 23/12/2021
24 CC006000000195522 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The complainant is absent. The respondent is present. The MahaRERA has noticed that on last two occasions also, the complainant despite notice has remained absent. It shows that the complainant is not willing to contest these complaints. Consequently, all three complaints stand dismissed for want of prosecution. 20/06/2022
25 CC006000000195593 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The parties are heard at length. The liberty is granted to the respondent to upload the judgements relied upon it on record of MahaRERA by today evening. The hearing is concluded. The order is reserved. 30/05/2022
26 CC006000000196360 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA 11/05/2021 05/05/2021
27 CC006000000196384 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the submissions. The hearing is concluded. Order is reserved. 23/12/2021
28 CC006000000197438 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both parties are present. The respondent has filed its sur-rejoinder to the joinder of the complainant on 18-01-2023. Therefore, all the pleadings in this complaint are over. Both sides have argued the matter today. The complainant avers that according to the prayers, there were certain sums of money which have been paid to the respondent/promoter not for the purposes mentioned in the agreement for sale but for some other purpose. Therefore, although the complainant/allottee has taken possession 20/01/2023
29 CC006000000198067 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The complainant promoter is present. The respondent allottee is absent. In fact, the respondent allottee has also been absent in the conciliation hearings and the said fact is recorded in the Roznama of the Conciliation Forum. The respondent allottee has neither appeared in the conciliation nor has filed any reply to the complaint of the promoter and is also not appearing in the hearings before the MahaRERA, despite service of this complaint on him. The complainant promoter is directed to file w 20/01/2023
30 CC006000000198068 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the submissions of the parties. This complaint was transferred to MahaRERA Conciliation Forum for appropriate action and accordingly both the parties appeared and settled the matter amicably before MahaRERA conciliation forum and the same is recorded in the Roznama dt. on 03/12/2021. During the course of hearing, the learned advocate for the complainant has stated that as per the settlement terms agreed between the parties before the MahaRERA Conciliation For 27/01/2022
31 CC006000000198069 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Complainant present. Respondent absent. Heard the submissions of the complainant. This complaint was transferred to MahaRERA Conciliation Forum for appropriate action and accordingly both the parties appeared and settled the matter amicably before MahaRERA conciliation forum and the same is recorded in the proceeding of Conciliation Forum dated 5-01-2022. During the course of hearing, the learned advocate for the complainant has stated that as per the settlement terms the respondent has agreed 27/01/2022
32 CC006000000209391 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The complainant is absent. The respondent is present. The respondent avers that the matter is amicably settled and the terms of settlement will be uploaded immediately. The complainant has neither appeared nor disputed the said terms of settlement dated 06-10-2022. In view of the above, the complaint stands disposed of as settled as per the terms of settlement. 13/12/2022
33 CC006000000220677 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both parties are present. In the previous hearing, the complainant has argued his case. The respondent has filed its reply and argued the matter today. The respondent avers that, the complainant had to register the agreement for sale within 15 days of the booking which was done by paying 5% of the total consideration. However, despite multiple communications from the respondent to the complainant, the complainant has failed to pay the stamp duty and to register the agreement for sale. There 13/10/2022
34 CC006000000251522 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The parties are present. Due to paucity of time the matter stands adjourned till 28.06.2022. 27/06/2022
35 CC006000000251524 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. The applicant(org respondent) has filed this review against the order of the MahaRERA dated 28-03-2022 granting refund to the respondent (org complainant) without forfeiting any amount, due to the fact that the respondent-original complainant lost his job during the pandemic. Two reasons for review according to the applicant are that no forfeiture has been ordered despite established case law / circulars of MahaRERA and orders in the said project itself. Th 14/09/2022
36 CC006000000364548 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA “First Hearing Matter” Both the parties are present. Admittedly, this complaint has been filed for refund after the registered cancellation deed has been signed by the complainant with the respondent on 23-07-2021. However, after signing the said cancellation deed, the amount of stamp duty and registration charges were refunded by the respondent to the complainant. Now, the complaint has been filed for refund of the consideration paid to the respondent. The respondent has raised the issue 30/05/2023
37 CC006000000395460 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Both parties confirm that the matter is amicably settled and the respondent has uploaded the withdrawal letter signed by both the parties on 6-2-2024 in the complaint. In view of the above, this matter is disposed of as settled and withdrawn. 07/06/2024
38 CC006000000429077 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA “First Hearing Matter” Both the parties are present. The matter was kept today for final arguments by both sides. Accordingly, the promoter has argued that the refund has been granted despite the fact that the allottee has quoted personal grounds to seek refund and therefore such grounds are not permissible as per the case law. Moreover, there is no violation of sections of RERA, specifically, sections 12, 14, 18 and 19 which as per the case law are the grounds for violation for which refund 02/07/2024
39 CC006000000429081 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA “First Hearing Matter” The applicant- promoter is present. The respondent - allottee is absent. In fact, the allottee has never appeared before the MahaRERA in any of the hearings. The allottees have also not filed any reply or written arguments despite directions. The matter was kept today for final arguments. Therefore, the allottee is given one last chance to file its reply and written arguments within a period of one week i.e. by 08-07-2024. In case the respondent - allottee does not file 02/07/2024
40 CC006000000480010 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Both the parties confirm that the matter is amicably settled and withdrawal application dated 17-06-2024 signed by the complainant is attached in the Roznama of Conciliation forum dated 18-06-2024. In view of the above, this matter is disposed of as settled and withdrawn. 02/07/2024
41 CC006000000480355 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA “First Hearing Matter” The complainant-promoter is present. The respondent-allottee is absent. An earlier order came to be issued in the same matter on 6-4-2023 in the earlier complaint filed by the complainant-promoter vide which the complainant-promoter was entitled to terminate the allotment. However, the complainant has approached the MahaRERA again for directions to cancel the agreement for sale consequent to termination of allotment as per the earlier order. The respondent-allottee has 04/06/2024
42 CC006000000500410 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA “First Hearing Matter” Both the parties are present. Both parties agree that the matter may be fixed for hearing on merits. Therefore, this matter is to be fixed for hearing on merits strictly as per seniority. The complainant-promoter has also contended that an ad interim injunction may be issued in the complaint restraining the respondent-allottee from creating third party rights in the allotment. It is ordered accordingly considering the earlier order passed by the MahaRERA on 27-4-2022. 04/06/2024
43 CC006000000591490 NA NA NA
Sr. No. Complaint Number Interim Order Date
1 CC006000000000579 NA NA
2 CC006000000000783 NA NA
3 CC006000000001262 NA NA
4 CC006000000001797 NA NA
5 CC006000000012487 NA NA
6 CC006000000012763 NA NA
7 CC006000000054955 NA NA
8 CC006000000078952 02/06/2021
9 CC006000000078979 02/06/2021
10 CC006000000079127 02/06/2021
11 CC006000000079137 NA NA
12 CC006000000079353 NA NA
13 CC006000000089708 NA NA
14 CC006000000100440 NA NA
15 CC006000000171826 NA NA
16 CC006000000193070 NA NA
17 CC006000000193189 NA NA
18 CC006000000193311 NA NA
19 CC006000000193857 NA NA
20 CC006000000193978 NA NA
21 CC006000000194816 NA NA
22 CC006000000195178 NA NA
23 CC006000000195358 NA NA
24 CC006000000195522 NA NA
25 CC006000000195593 NA NA
26 CC006000000196360 NA NA
27 CC006000000196384 NA NA
28 CC006000000197438 NA NA
29 CC006000000198067 NA NA
30 CC006000000198068 NA NA
31 CC006000000198069 NA NA
32 CC006000000209391 NA NA
33 CC006000000220677 NA NA
34 CC006000000251522 NA NA
35 CC006000000251524 NA NA
36 CC006000000364548 NA NA
37 CC006000000395460 NA NA
38 CC006000000429077 NA NA
39 CC006000000429081 NA NA
40 CC006000000480010 NA NA
41 CC006000000480355 NA NA
42 CC006000000500410 NA NA
43 CC006000000591490 NA NA
Sr. No. Complaint Number Final Order Date
1 CC006000000000579 18/11/2017
2 CC006000000000783 16/05/2018
3 CC006000000001262 17/05/2018
4 CC006000000001797 26/02/2018
5 CC006000000012487 05/04/2018
6 CC006000000012763 26/02/2018
7 CC006000000054955 21/01/2020
8 CC006000000078952 15/10/2022
9 CC006000000078979 15/10/2022
10 CC006000000079127 15/10/2022
11 CC006000000079137 06/11/2020
12 CC006000000079353 06/11/2020
13 CC006000000089708 11/11/2019
14 CC006000000100440 27/11/2020
15 CC006000000171826 21/08/2023
16 CC006000000193070 01/03/2021
17 CC006000000193189 20/06/2022
18 CC006000000193311 26/03/2021
19 CC006000000193857 10/10/2020
20 CC006000000193978 20/06/2022
21 CC006000000194816 15/05/2022
22 CC006000000195178 24/02/2022
23 CC006000000195358 05/12/2022
24 CC006000000195522 20/06/2022
25 CC006000000195593 30/04/2024
26 CC006000000196360 08/09/2021
27 CC006000000196384 11/04/2022
28 CC006000000197438 25/05/2023
29 CC006000000198067 12/04/2023
30 CC006000000198068 27/01/2022
31 CC006000000198069 27/01/2022
32 CC006000000209391 14/12/2022
33 CC006000000220677 19/12/2022
34 CC006000000251522 12/07/2022
35 CC006000000251524 05/12/2022
36 CC006000000364548 NA NA
37 CC006000000395460 08/06/2024
38 CC006000000429077 NA NA
39 CC006000000429081 NA NA
40 CC006000000480010 02/07/2024
41 CC006000000480355 NA NA
42 CC006000000500410 NA NA
43 CC006000000591490 NA NA

Non Compliance Details:

Sr. No. Complaint Number Non Compliance Applied Date
1 CC006000000000579 NA
2 CC006000000000783 NA
3 CC006000000001262 NA
4 CC006000000001797 14/01/2020
5 CC006000000012487 NA
6 CC006000000012763 NA
7 CC006000000054955 NA
8 CC006000000078952 NA
9 CC006000000078979 NA
10 CC006000000079127 NA
11 CC006000000079137 NA
12 CC006000000079353 NA
13 CC006000000089708 NA
14 CC006000000100440 NA
15 CC006000000171826 16/06/2022
16 CC006000000193070 NA
17 CC006000000193189 NA
18 CC006000000193311 07/06/2021
19 CC006000000193857 NA
20 CC006000000193978 NA
21 CC006000000194816 NA
22 CC006000000195178 26/04/2022
23 CC006000000195358 17/02/2023
24 CC006000000195522 NA
25 CC006000000195593 21/11/2022
26 CC006000000196360 NA
27 CC006000000196384 NA
28 CC006000000197438 NA
29 CC006000000198067 NA
30 CC006000000198068 NA
31 CC006000000198069 NA
32 CC006000000209391 NA
33 CC006000000220677 NA
34 CC006000000251522 NA
35 CC006000000251524 NA
36 CC006000000364548 NA
37 CC006000000395460 NA
38 CC006000000429077 NA
39 CC006000000429081 NA
40 CC006000000480010 NA
41 CC006000000480355 NA
42 CC006000000500410 NA
43 CC006000000591490 NA
Sr. No. Complaint Number Non Compliance Roznama Roznama File Date
1 CC006000000000579 NA NA NA
2 CC006000000000783 NA NA NA
3 CC006000000001262 NA NA NA
4 CC006000000001797 The Complainant is absent; The Respondent is present. Respondent brings to the notice of this Authority that he has complied with the order dated 26.02.2018 and nothing remains in the matter. It is also brought to the notice of the Authority that the Complainant has sought to withdraw the complaint. In view of above the complaint stands disposed. 02/09/2022
5 CC006000000012487 NA NA NA
6 CC006000000012763 NA NA NA
7 CC006000000054955 NA NA NA
8 CC006000000078952 NA NA NA
9 CC006000000078979 NA NA NA
10 CC006000000079127 NA NA NA
11 CC006000000079137 NA NA NA
12 CC006000000079353 NA NA NA
13 CC006000000089708 NA NA NA
14 CC006000000100440 NA NA NA
15 CC006000000171826 Heard the complainant in person. He has submitted that the order dated 06.04.2022 has been modified by the Hon’ble Authority in the Review proceeding. The complainant has preferred Appeal before the Hon’ble Appellate Tribunal and the same is pending. In view of these facts, the present execution proceeding is liable to be disposed of with liberty to the complainant to apply for execution of the order that may be passed in the Appeal. 07/07/2023
16 CC006000000193070 NA NA NA
17 CC006000000193189 NA NA NA
18 CC006000000193311 Adjourned 05/06/2023
19 CC006000000193857 NA NA NA
20 CC006000000193978 NA NA NA
21 CC006000000194816 NA NA NA
22 CC006000000195178 Complainant absent when called out. Adv. Abir Patel for the respondent present. Order passed. Dismissed for default. Matter stands disposed off accordingly. 23/07/2024
23 CC006000000195358 The rejoinder filed by the complainants is not on record. Therefore, the complainants are directed to file a hard copy of the rejoinder in the BKC office within 7 days. The said rejoinder was served on the respondent yesterday only. Therefore Ld. Counsel for the respondent wants time to consider the same. The respondent may file sur-rejoinder within 7 days with a copy to the complainants. The matter is adjourned for final hearing on 02.09.2024@ 12 noon. 06/08/2024
24 CC006000000195522 NA NA NA
25 CC006000000195593 Heard both sides at length. The Ld. Counsel for the respondent wants to file written submissions. It may be done within 15 days. The otherside may respond to it, if so desired. The matter is closed for order. 27/10/2023
26 CC006000000196360 NA NA NA
27 CC006000000196384 NA NA NA
28 CC006000000197438 NA NA NA
29 CC006000000198067 NA NA NA
30 CC006000000198068 NA NA NA
31 CC006000000198069 NA NA NA
32 CC006000000209391 NA NA NA
33 CC006000000220677 NA NA NA
34 CC006000000251522 NA NA NA
35 CC006000000251524 NA NA NA
36 CC006000000364548 NA NA NA
37 CC006000000395460 NA NA NA
38 CC006000000429077 NA NA NA
39 CC006000000429081 NA NA NA
40 CC006000000480010 NA NA NA
41 CC006000000480355 NA NA NA
42 CC006000000500410 NA NA NA
43 CC006000000591490 NA NA NA
Sr. No. Complaint Number Non Compliance Interim Order Date
1 CC006000000000579 NA NA
2 CC006000000000783 NA NA
3 CC006000000001262 NA NA
4 CC006000000001797 NA NA
5 CC006000000012487 NA NA
6 CC006000000012763 NA NA
7 CC006000000054955 NA NA
8 CC006000000078952 NA NA
9 CC006000000078979 NA NA
10 CC006000000079127 NA NA
11 CC006000000079137 NA NA
12 CC006000000079353 NA NA
13 CC006000000089708 NA NA
14 CC006000000100440 NA NA
15 CC006000000171826 NA NA
16 CC006000000193070 NA NA
17 CC006000000193189 NA NA
18 CC006000000193311 NA NA
19 CC006000000193857 NA NA
20 CC006000000193978 NA NA
21 CC006000000194816 NA NA
22 CC006000000195178 NA NA
23 CC006000000195358 NA NA
24 CC006000000195522 NA NA
25 CC006000000195593 NA NA
26 CC006000000196360 NA NA
27 CC006000000196384 NA NA
28 CC006000000197438 NA NA
29 CC006000000198067 NA NA
30 CC006000000198068 NA NA
31 CC006000000198069 NA NA
32 CC006000000209391 NA NA
33 CC006000000220677 NA NA
34 CC006000000251522 NA NA
35 CC006000000251524 NA NA
36 CC006000000364548 NA NA
37 CC006000000395460 NA NA
38 CC006000000429077 NA NA
39 CC006000000429081 NA NA
40 CC006000000480010 NA NA
41 CC006000000480355 NA NA
42 CC006000000500410 NA NA
43 CC006000000591490 NA NA
Sr. No. Complaint Number Non Compliance Final Order Date
1 CC006000000000579 NA NA
2 CC006000000000783 NA NA
3 CC006000000001262 NA NA
4 CC006000000001797 02/09/2022
5 CC006000000012487 NA NA
6 CC006000000012763 NA NA
7 CC006000000054955 NA NA
8 CC006000000078952 NA NA
9 CC006000000078979 NA NA
10 CC006000000079127 NA NA
11 CC006000000079137 NA NA
12 CC006000000079353 NA NA
13 CC006000000089708 NA NA
14 CC006000000100440 NA NA
15 CC006000000171826 18/07/2023
16 CC006000000193070 NA NA
17 CC006000000193189 NA NA
18 CC006000000193311 08/06/2023
19 CC006000000193857 NA NA
20 CC006000000193978 NA NA
21 CC006000000194816 NA NA
22 CC006000000195178 23/07/2024
23 CC006000000195358 NA NA
24 CC006000000195522 NA NA
25 CC006000000195593 30/04/2024
26 CC006000000196360 NA NA
27 CC006000000196384 NA NA
28 CC006000000197438 NA NA
29 CC006000000198067 NA NA
30 CC006000000198068 NA NA
31 CC006000000198069 NA NA
32 CC006000000209391 NA NA
33 CC006000000220677 NA NA
34 CC006000000251522 NA NA
35 CC006000000251524 NA NA
36 CC006000000364548 NA NA
37 CC006000000395460 NA NA
38 CC006000000429077 NA NA
39 CC006000000429081 NA NA
40 CC006000000480010 NA NA
41 CC006000000480355 NA NA
42 CC006000000500410 NA NA
43 CC006000000591490 NA NA

For Warrant Issued:

Sr. No. Complaint Number Warrant (Yes/No) Date of Issuance of Warrant District Collector Total Amount of Recovery Warrant Copy of Issued Warrant
1 CC006000000000579 No NA NA NA NA
2 CC006000000000783 No NA NA NA NA
3 CC006000000001262 No NA NA NA NA
4 CC006000000001797 No NA NA NA NA
5 CC006000000012487 No NA NA NA NA
6 CC006000000012763 No NA NA NA NA
7 CC006000000054955 No NA NA NA NA
8 CC006000000078952 No NA NA NA NA
9 CC006000000078979 No NA NA NA NA
10 CC006000000079127 No NA NA NA NA
11 CC006000000079137 No NA NA NA NA
12 CC006000000079353 No NA NA NA NA
13 CC006000000089708 No NA NA NA NA
14 CC006000000100440 No NA NA NA NA
15 CC006000000171826 No NA NA NA NA
16 CC006000000193070 No NA NA NA NA
17 CC006000000193189 No NA NA NA NA
18 CC006000000193311 No NA NA NA NA
19 CC006000000193857 No NA NA NA NA
20 CC006000000193978 No NA NA NA NA
21 CC006000000194816 No NA NA NA NA
22 CC006000000195178 No NA NA NA NA
23 CC006000000195358 No NA NA NA NA
24 CC006000000195522 No NA NA NA NA
25 CC006000000195593 No NA NA NA NA
26 CC006000000196360 No NA NA NA NA
27 CC006000000196384 No NA NA NA NA
28 CC006000000197438 No NA NA NA NA
29 CC006000000198067 No NA NA NA NA
30 CC006000000198068 No NA NA NA NA
31 CC006000000198069 No NA NA NA NA
32 CC006000000209391 No NA NA NA NA
33 CC006000000220677 No NA NA NA NA
34 CC006000000251522 No NA NA NA NA
35 CC006000000251524 No NA NA NA NA
36 CC006000000364548 No NA NA NA NA
37 CC006000000395460 No NA NA NA NA
38 CC006000000429077 No NA NA NA NA
39 CC006000000429081 No NA NA NA NA
40 CC006000000480010 No NA NA NA NA
41 CC006000000480355 No NA NA NA NA
42 CC006000000500410 No NA NA NA NA
43 CC006000000591490 No NA NA NA NA