Project Details

Project Name:
KARRM GARDENS - 1
Promoter Name:
KARRM INFRASTRUCTURE PRIVATE LIMITED
Certificate Download:

Promoter Organization Name:

Sr. No. Name of Self-Regulatory Organization (SRO) Membership Number
1 NAREDCO (National Real Estate Development Council) RPM/MAH/NR517000481
District:
Thane
Registration Date:
18/08/2017
Proposed Date of Completion:
30/11/2020

Extension under Section 6:

Sr. No. From Date: To Date:
1st Extension NA NA

Extension under Section 7 (3):

Sr. No. From Date: To Date:
1st Extension 31/05/2019 30/05/2020

Building Details

Number of Apartment:
352
Number of Booked Apartment:
349
Percentage of Booked Apartment:
99.15

Form 5

Sr. No. Form 5 Document Upload Date View
1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18) 30/11/2019

Percentage of Work:

Sr. No. Building Name Percentage of Work (%)
1 GULAB 74.5
2 CHAPHA 74
3 JUI 68.5
4 JAI 71
5 MOGRA 65
6 NISHIGANDH 59
7 PARIJAT 54.5
8 GULMOHAR 56.5
9 JASWAND 57.5
10 BAKUL 54.5

Complaint Details:

Sr. No. Complaint Number Date Appeal Filed
1 CC006000000001450 25/10/2017 No
2 CC006000000056079 17/09/2018 No
3 CC006000000079119 01/05/2019 No
4 CC006000000089591 11/06/2019 No
5 CC006000000089816 21/06/2019 No
6 CC006000000089988 02/12/2019 No
7 CC006000000100193 18/07/2019 No
8 CC006000000100341 27/08/2019 No
9 CC006000000100504 04/09/2019 Yes
10 CC006000000100595 20/08/2019 No
11 CC006000000110702 26/08/2019 No
12 CC006000000110749 29/08/2019 No
13 CC006000000140994 22/09/2019 No
14 CC006000000151220 10/10/2019 No
15 CC006000000171720 11/12/2019 No
16 CC006000000171901 17/12/2019 No
17 CC006000000192729 06/03/2020 No
18 CC006000000192920 30/03/2020 No
19 CC006000000192969 19/03/2020 No
20 CC006000000194833 06/11/2020 No
21 CC006000000195105 01/12/2020 No
22 CC006000000195547 20/02/2021 No
23 CC006000000195986 17/02/2021 No
24 CC006000000196256 04/03/2021 No
25 CC006000000196658 06/04/2021 No
26 CC006000000198867 29/10/2021 No
27 CC006000000209592 10/01/2022 No
28 CC006000000220985 28/04/2022 No
Sr. No. Complaint Number Bench Name Roznama Roznama File Date
1 CC006000000001450 CORAM: Hon’ble Shri Bhalchandra D. Kapadnis, Member, MahaRERA Both the parties present. The parties want to settle the matter amicably. Adjourned for settlement/plea. NA 26/11/2017
2 CC006000000056079 CORAM: Hon’ble Shri Bhalchandra D. Kapadnis, Member, MahaRERA C present. R - present represented through Adv. Jain. Plea recorded, pleads not guilty. Adjourned for evidence/settlement. NA 31/10/2018
3 CC006000000079119 CORAM: Hon’ble Shri Bhalchandra D. Kapadnis, Member, MahaRERA C present. R absent, notice of hearing is served upon him. C to submit amendment application. Amendment allowed. C submits payment statement. Exparte order is passed. Proceeding closed. L/o the complainant submits the tripartite agreement. Adjourned for - 1) appearance of R /plea. 2) Exparte Order. NA 08/05/2019
4 CC006000000089591 CORAM: Hon’ble Shri Bhalchandra D. Kapadnis, Member, MahaRERA C present. R absent, notice of hearing is served upon him. Heard the C. Closed for order. Proceeding closed. NA 15/07/2019
5 CC006000000089816 CORAM: Hon’ble Shri Bhalchandra D. Kapadnis, Member, MahaRERA C present. R absent, notice of hearing is served upon him. Adjourned for -1) Payment statement. 2) Appearance of R. 3) Exparte order. NA 15/07/2019
6 CC006000000089988 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Heard the arguments of the complainant. The validity of the project has been lapsed. Hence the case stands closed for order. Legal Consultant 03/12/2020
7 CC006000000100193 CORAM: Hon’ble Shri Bhalchandra D. Kapadnis, Member, MahaRERA C present. R absent despite receiving the notice of hearing. C to file the amendment application making Karrm Infrastructure party to the complaint. Adjourned for- 1) Payment statement. 2) Copy to be served upon the R. 3) Explanation. 4) Hearing. NA 04/09/2019
8 CC006000000100341 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the submissions. The learned advocate for the complainant seeks an adjournment on the ground that the senior advocate on record is tested covid positive. The learned advocate for the respondent also seeks time to settle the matter amicably. Hence, on request of both the parties two weeks’ time is granted to settle the matter amicably and to file consent terms on record of MahaRERA, failing which the final order would be passed after two weeks based on the subm 19/03/2022
9 CC006000000100504 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the submissions. The complainant is seeking refund under section 18 of the RERA. The learned advocate for the respondent also seeks time to settle the matter amicably. Hence, on request of the respondent two weeks’ time is granted to settle the matter amicably and file consent terms on record of MahaRERA, failing which the final order would be passed after two weeks based on the submissions made by the parties. Order is reserved. 19/03/2022
10 CC006000000100595 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Complainant present in person. Respondent absent. Complainant seeks refund and withdrawal from the project a/w compensation and interest as the date of possession in the agreement for sale dt 13/9/14 has lapsed. Hence transferred to Adjudicating Officer, Mumbai for appropriate decision. NA 09/09/2019
11 CC006000000110702 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Complainant in person. None for the respondent. Complainant is seeking refund a/w. interest & compensation. Hence, matter transferred to A O Mumbai for adjudication. NA 05/09/2019
12 CC006000000110749 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Adv. Shyam Mohite for the complainant. None for the respondent. Complainant is seeking refund of amount a/w. interest & compensation. Hence transferred to A O Mumbai for adjudication. NA 05/09/2019
13 CC006000000140994 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Complainant absent. Respondent is present. Heard the submissions of the respondent. The learned advocate for the respondent seeks time to settle the matter amicably with the complainant. Hence, on request of the respondent two weeks’ time is granted to the parties to settle the matter amicably and file consent terms on record of MahaRERA, failing which the final order would be passed after two weeks based on the submissions made by the parties. Order is reserved. 19/03/2022
14 CC006000000151220 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Complainant in person. None for the respondent. In compliance to natural justice, Matter adjourned to 16/12/2019. NA 17/10/2019
15 CC006000000171720 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Heard the arguments of the complainant. The validity of the project has lapsed. The complainant is seeking refund along with interest and compensation under section 18 of the RERA. Hence the case stands transferred to the Ld. Adjudicating Officer, MahaRERA Mumbai for appropriate decision. In the meantime, the respondent to apply for extension of project validity period. Legal Consultant NA 03/12/2020
16 CC006000000171901 CORAM: Hon’ble Shri Bhalchandra D. Kapadnis, Member, MahaRERA Adv sachin Mahagavkar a/w Adv Divya Sheth i/b Divya Shah appears for the C. None appear for the R despite receiving the notice of hearing. Adjourned for- 1) to ascertain the final settlement date. 2)Payment statement. NA 17/02/2020
17 CC006000000192729 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the arguments. One week’s time is given to the parties to file their reply/ rejoinder / consent terms on record of MahaRERA. The submissions filed after one week period would not be accepted and the final order would be passed based on available record. Order Reserved. 11/10/2021
18 CC006000000192920 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the arguments. One week’s time is given to the parties to file their reply/ rejoinder / consent terms on record of MahaRERA. The submissions filed after one week period would not be accepted and the final order would be passed based on available record. Order Reserved. 11/10/2021
19 CC006000000192969 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the arguments. One week’s time is given to the parties to file their reply/ rejoinder / consent terms on record of MahaRERA. The submissions filed after one week period would not be accepted and the final order would be passed based on available record. Order Reserved. 11/10/2021
20 CC006000000194833 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both parties are absent. However, the MahaRERA Conciliation Forum has reported on 09-12-2022 that the conciliation has been concluded successfully between the parties on 07-09-2022. Neither parties have appeared before the MahaRERA in the hearing today to contest or complain about the said terms of settlement. Therefore, this matter is disposed of as settled as per the terms of the conciliation. 30/12/2022
21 CC006000000195105 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are absent. In fact, both the parties were absent in the previous hearing as well, when a last chance was given to the complainant. As the complainant is absent again, this matter is dismissed for default. 26/04/2023
22 CC006000000195547 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The complainant is present. The respondent is absent. As per the terms of the conciliation dated 20-12-2022, the complaint is amicable settled. However, the complainant avers that the respondent was supposed to give a letter also as per the terms of the settlement. In any case, the said settlement is recorded in the Roznama of Conciliation Forum. In view of the above, this complaint is disposed of as settled. In case the complainant has any grievance regarding the said settlement, he can a 04/02/2023
23 CC006000000195986 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA The complainant is present. The respondent is absent. The association of allottees in the project has signed consent terms with the respondent/promoter on 3rd October 2022 which has been taken on record of MahaRERA and the complaint filed by association was disposed off accordingly. The said complaint vide no C006000000196256 was disposed of 29-11-2022 in terms of the amicable settlement. Copy of the said settlement has not been uploaded by the respondent despite directions in the previous 26/04/2023
24 CC006000000196256 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. The complainant has already uploaded terms of settlement on 14-10-2022 with the respondent. Admittedly, this complaint has been amicably settled as per the terms of settlement. In view of the above, this complaint is disposed of as amicably settled. 30/11/2022
25 CC006000000196658 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the arguments. One week’s time is given to the parties to file their reply/ rejoinder / consent terms on record of MahaRERA. The submissions filed after one week period would not be accepted and the final order would be passed based on available record. Order Reserved. 11/10/2021
26 CC006000000198867 CORAM: Hon’ble Shri. Mahesh Pathak, Member I, MahaRERA Both the parties are present. Heard the submissions. During the hearing, both the parties submitted that they are settling the matter amicably and hence they seek time to file consent terms on record of MahaRERA. Hence, on request of both the parties two weeks’ time is granted to the parties to resolve the issue amicably and to file consent terms on record of MahaRERA. Failing which the final order would be passed after two weeks based on the submissions made by the parties. Order is reserve 19/03/2022
27 CC006000000209592 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA The Complainant to file the account sheet together with all papers and written submissions on or before the 31.03.2022. The Respondent to also file their written submissions by the 07.04.2022, subsequent to which the matter will be Reserved for orders. 27/03/2022
28 CC006000000220985 CORAM: Hon’ble Shri. Ajoy Mehta, Chairperson, MahaRERA The Complainant is present; the Respondent is absent. Parties are at liberty to file written submission on or before the 05.12.2022 with service on each other. Parties are at liberty to file replies to that written submission on or before the 19.12.2022. Subsequent to which, the matter will be reserved for orders. 30/11/2022
Sr. No. Complaint Number Interim Order Date
1 CC006000000001450 NA NA
2 CC006000000056079 NA NA
3 CC006000000079119 NA NA
4 CC006000000089591 NA NA
5 CC006000000089816 NA NA
6 CC006000000089988 NA NA
7 CC006000000100193 NA NA
8 CC006000000100341 27/11/2019
9 CC006000000100504 27/11/2019
10 CC006000000100595 NA NA
11 CC006000000110702 27/11/2019
12 CC006000000110749 27/11/2019
13 CC006000000140994 27/11/2019
14 CC006000000151220 NA NA
15 CC006000000171720 NA NA
16 CC006000000171901 NA NA
17 CC006000000192729 NA NA
18 CC006000000192920 NA NA
19 CC006000000192969 NA NA
20 CC006000000194833 NA NA
21 CC006000000195105 NA NA
22 CC006000000195547 NA NA
23 CC006000000195986 NA NA
24 CC006000000196256 NA NA
25 CC006000000196658 NA NA
26 CC006000000198867 NA NA
27 CC006000000209592 NA NA
28 CC006000000220985 NA NA
Sr. No. Complaint Number Final Order Date
1 CC006000000001450 22/03/2018
2 CC006000000056079 01/01/2020
3 CC006000000079119 25/07/2019
4 CC006000000089591 31/12/2019
5 CC006000000089816 30/03/2021
6 CC006000000089988 17/12/2020
7 CC006000000100193 02/01/2020
8 CC006000000100341 19/03/2022
9 CC006000000100504 19/03/2022
10 CC006000000100595 21/09/2020
11 CC006000000110702 18/03/2021
12 CC006000000110749 30/08/2021
13 CC006000000140994 19/03/2022
14 CC006000000151220 17/12/2019
15 CC006000000171720 04/01/2021
16 CC006000000171901 12/07/2021
17 CC006000000192729 30/11/2021
18 CC006000000192920 30/11/2021
19 CC006000000192969 30/11/2021
20 CC006000000194833 30/12/2022
21 CC006000000195105 26/04/2023
22 CC006000000195547 05/02/2023
23 CC006000000195986 18/08/2023
24 CC006000000196256 17/01/2023
25 CC006000000196658 30/11/2021
26 CC006000000198867 19/03/2022
27 CC006000000209592 22/09/2022
28 CC006000000220985 28/12/2022

Non Compliance Details:

Sr. No. Complaint Number Non Compliance Applied Date
1 CC006000000001450 NA
2 CC006000000056079 17/10/2019
3 CC006000000079119 29/09/2019
4 CC006000000089591 04/11/2019
5 CC006000000089816 25/12/2019
6 CC006000000089988 NA
7 CC006000000100193 29/09/2020
8 CC006000000100341 NA
9 CC006000000100504 NA
10 CC006000000100595 16/05/2021
11 CC006000000110702 03/04/2021
12 CC006000000110749 NA
13 CC006000000140994 29/08/2022
14 CC006000000151220 NA
15 CC006000000171720 NA
16 CC006000000171901 05/12/2022
17 CC006000000192729 NA
18 CC006000000192920 NA
19 CC006000000192969 NA
20 CC006000000194833 14/03/2023
21 CC006000000195105 NA
22 CC006000000195547 04/05/2023
23 CC006000000195986 NA
24 CC006000000196256 NA
25 CC006000000196658 NA
26 CC006000000198867 26/10/2022
27 CC006000000209592 13/11/2023
28 CC006000000220985 NA
Sr. No. Complaint Number Non Compliance Roznama Roznama File Date
1 CC006000000001450 NA NA NA
2 CC006000000056079 C present. R absent in spite of receiving the notice of hearing. C submits the R has not complied with the order as he has not repaid the loan amount to the bank. Order imposing penalty is passed. Proceeding closed. NA NA
3 CC006000000079119 C present. R absent in-spite of receiving the notice of hearing. C to submit the payment statement. Issue recovery warrant u/s 40(1). Order is passed. Proceeding closed. NA NA
4 CC006000000089591 Sir on leave. NA NA
5 CC006000000089816 Adjourned due to Carona virus. NA NA
6 CC006000000089988 NA NA NA
7 CC006000000100193 NA NA NA
8 CC006000000100341 NA NA NA
9 CC006000000100504 NA NA NA
10 CC006000000100595 Heard both sides. The complainant states that the matter has not been settled. Even he has not been informed about the process of settlement. The ld. Counsel for the respondent submitted that he needs time to collect funds in order to comply with the order. In the circumstances, the matter is not yet settled, it will be appropriate to issue warrant for the recovery and the parties are at liberty to settle the matter even after the issuance of the warrant. Issue warrant under section 40(1) 01/04/2022
11 CC006000000110702 Adjourned to 21.10.2021 for further orders. NA
12 CC006000000110749 NA NA NA
13 CC006000000140994 Complainant present. Respondent absent. Heard complainant in person.Reserved for order. 28/06/2023
14 CC006000000151220 NA NA NA
15 CC006000000171720 NA NA NA
16 CC006000000171901 Complainant present as well as Adv.Shamina for the complainant present. Both the Respondents absent and none present for the respondents. Adv.Shamina submits that the respondent No.1 has not complied the order and amount is not refunded with interest as per the order and prayed for suitable action. None present for the respondents and hence submission on behalf of respondents not on record. Under such circumstances this is a suitable matter for issuance of recovery warrant for recovery of due 14/06/2023
17 CC006000000192729 NA NA NA
18 CC006000000192920 NA NA NA
19 CC006000000192969 NA NA NA
20 CC006000000194833 Complainant present in person. Adv. Mahesh Chitnis for complainant present. Respondent absent. Heard Adv. Mahesh Chitnis. He submits that without consent terms, the matter is disposed off and hence prayed to restore the matter before the MahaRERA Authority. Reserved for order. 04/07/2023
21 CC006000000195105 NA NA NA
22 CC006000000195547 Complainant present in person. Respondent absent when called out. Heard complainant in person. Copy of Rozanama along with consent terms filed on record. Reserve For Order 05/12/2023
23 CC006000000195986 NA NA NA
24 CC006000000196256 NA NA NA
25 CC006000000196658 NA NA NA
26 CC006000000198867 Complainant along with Adv. SudipMallick i/b. N. Deepak &Co.present. Respondent absent. Heard Adv. SudipMallick i/b. N. Deepak & Co. Order passed to issue recovery warrant. 04/07/2023
27 CC006000000209592 Complainant present in person. Respondent absent. Heard argument of complainant in person. Respondent was absent on the previous date as well as on today. Hence reserved for order. 27/12/2023
28 CC006000000220985 NA NA NA
Sr. No. Complaint Number Non Compliance Interim Order Date
1 CC006000000001450 NA NA
2 CC006000000056079 NA NA
3 CC006000000079119 NA NA
4 CC006000000089591 NA NA
5 CC006000000089816 NA NA
6 CC006000000089988 NA NA
7 CC006000000100193 NA NA
8 CC006000000100341 NA NA
9 CC006000000100504 NA NA
10 CC006000000100595 NA NA
11 CC006000000110702 NA NA
12 CC006000000110749 NA NA
13 CC006000000140994 NA NA
14 CC006000000151220 NA NA
15 CC006000000171720 NA NA
16 CC006000000171901 NA NA
17 CC006000000192729 NA NA
18 CC006000000192920 NA NA
19 CC006000000192969 NA NA
20 CC006000000194833 NA NA
21 CC006000000195105 NA NA
22 CC006000000195547 NA NA
23 CC006000000195986 NA NA
24 CC006000000196256 NA NA
25 CC006000000196658 NA NA
26 CC006000000198867 NA NA
27 CC006000000209592 NA NA
28 CC006000000220985 NA NA
Sr. No. Complaint Number Non Compliance Final Order Date
1 CC006000000001450 NA NA
2 CC006000000056079 26/07/2021
3 CC006000000079119 26/11/2020
4 CC006000000089591 26/07/2021
5 CC006000000089816 30/03/2021
6 CC006000000089988 NA NA
7 CC006000000100193 NA NA
8 CC006000000100341 NA NA
9 CC006000000100504 NA NA
10 CC006000000100595 01/07/2022
11 CC006000000110702 11/05/2022
12 CC006000000110749 NA NA
13 CC006000000140994 21/07/2023
14 CC006000000151220 NA NA
15 CC006000000171720 NA NA
16 CC006000000171901 05/09/2023
17 CC006000000192729 NA NA
18 CC006000000192920 NA NA
19 CC006000000192969 NA NA
20 CC006000000194833 21/07/2023
21 CC006000000195105 NA NA
22 CC006000000195547 19/12/2023
23 CC006000000195986 NA NA
24 CC006000000196256 NA NA
25 CC006000000196658 NA NA
26 CC006000000198867 04/07/2023
27 CC006000000209592 03/01/2024
28 CC006000000220985 NA NA

For Warrant Issued:

Sr. No. Complaint Number Warrant (Yes/No) Date of Issuance of Warrant District Collector Total Amount of Recovery Warrant Copy of Issued Warrant
1 CC006000000001450 No NA NA NA NA
2 CC006000000056079 No NA NA NA NA
3 CC006000000079119 No NA NA NA NA
4 CC006000000089591 No NA NA NA NA
5 CC006000000089816 No NA NA NA NA
6 CC006000000089988 No NA NA NA NA
7 CC006000000100193 No NA NA NA NA
8 CC006000000100341 No NA NA NA NA
9 CC006000000100504 No NA NA NA NA
10 CC006000000100595 No NA NA NA NA
11 CC006000000110702 Yes 11/05/2022 Thane 9706378.00
12 CC006000000110749 No NA NA NA NA
13 CC006000000140994 Yes 13/02/2024 Thane 4957395.00
14 CC006000000151220 No NA NA NA NA
15 CC006000000171720 No NA NA NA NA
16 CC006000000171901 No NA NA NA NA
17 CC006000000192729 No NA NA NA NA
18 CC006000000192920 No NA NA NA NA
19 CC006000000192969 No NA NA NA NA
20 CC006000000194833 No NA NA NA NA
21 CC006000000195105 No NA NA NA NA
22 CC006000000195547 Yes 05/08/2024 Thane 2857108.00
23 CC006000000195986 No NA NA NA NA
24 CC006000000196256 No NA NA NA NA
25 CC006000000196658 No NA NA NA NA
26 CC006000000198867 Yes 10/06/2024 Thane 9344784.00
27 CC006000000209592 No NA NA NA NA
28 CC006000000220985 No NA NA NA NA